Theodore F. Griffin - Houston TX, US Sean L. Gaudette - Katy TX, US Anthony P. Foster - Katy TX, US
Assignee:
Cooper Cameron Corporation - Houston TX
International Classification:
E21B033/06
US Classification:
277325, 251 12
Abstract:
A variable bore ram packer including a ram body, a top seal and a packer member designed for use in a standard ram-type blowout preventer used in oil and gas drilling operations is disclosed. The packer member is molded of an elastomeric material having a central semi-elliptical opening with a plurality of packer inserts molded within the elastomeric material in a semi-circular pattern around the central semi-elliptical opening of the elastomeric material. The semi-circular pattern of the packer inserts and the semi-elliptical opening of the elastomeric material share a common axis. The packer member and the plurality of packer inserts are molded into a unitary structure allowing the plurality of packer inserts to move and seat against different diameter tubular members to prevent extrusion of the elastomeric material between the packer inserts and the tubular member.
James R. Korte - Katy TX, US Kent A. Evans - Houston TX, US Dustin D. Ellis - Richmond TX, US John J. Thurston - Houston TX, US Anthony P. Foster - Katy TX, US Steve Rosenblatt - Houston TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
E21B 33/12 E21B 33/00
US Classification:
166387, 166285, 277323
Abstract:
A swelling packer is covered with a material that is preferably in a tubular form and slipped over the swelling element to be shrink fit with applied heat. The material is formulated to break down at temperatures slightly below the expected downhole temperatures so that ideally the packer has about 48 hours of swelling delay which is normally a time period long enough to allow it to be properly located without it swelling so much as to cause it to be damaged by running in. Various polymers can be used to make an imperious covering for run in that on the way starts to break down. Ideally the material for the cover disappears about the time of sealing or shortly thereafter.
Method And System For Anchoring And Isolating A Wellbore
Anthony P. Foster - Katy TX, US Basil J. Joseph - Sugar Land TX, US
International Classification:
E21B 33/128
US Classification:
166387
Abstract:
Downhole tools for anchoring and isolating at least one zone in a wellbore comprise a mandrel having an upper end, a lower end, an outer wall surface, and a longitudinal bore disposed therethrough having an axis. One or more anchors are disposed through the outer wall surface of the mandrel. Each of the anchors has a retracted position and an extended position. An isolation element is disposed along the outer wall surface of the mandrel. The isolation element may cover the anchors or be disposed, above, below, or around the anchors. Engagement of the isolation element with the inner wall surface of the wellbore to isolate at least one zone of the wellbore may be accomplished by piercing the isolation element to permit wellbore fluid to contact a swellable material contained within the isolation element, or by pumping fluid into the isolation element.
Method And System For Anchoring And Isolating A Wellbore
Anthony P. Foster - Katy TX, US Basil J. Joseph - Sugar Land TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
E21B 33/128
US Classification:
166387, 166134
Abstract:
Downhole tools for anchoring and isolating at least one zone in a wellbore comprise a mandrel having an upper end, a lower end, an outer wall surface, and a longitudinal bore disposed therethrough having an axis. One or more anchors are disposed through the outer wall surface of the mandrel. Each of the anchors has a retracted position and an extended position. An isolation element is disposed along the outer wall surface of the mandrel. The isolation element may cover the anchors or be disposed, above, below, or around the anchors. Engagement of the isolation element with the inner wall surface of the wellbore to isolate at least one zone of the wellbore may be accomplished by piercing the isolation element to permit wellbore fluid to contact a swellable material contained within the isolation element, or by pumping fluid into the isolation element.
Sealing Feed Through Lines For Downhole Swelling Packers
Anthony P. Foster - Katy TX, US Robert O. Castillo - Stafford TX, US Ammar Munshi - Houston TX, US Edward T. Wood - Kingwood TX, US Gregory C. Badke - Houston TX, US Nervy Enrique Faria - Houston TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
E21B 33/12
US Classification:
166188, 166195, 1662422, 1662423
Abstract:
A swelling element on a packer has a trough formed on a longitudinal axis. The control line or cable or conduit that needs to run along the string where the packer is mounted is first wrapped in a preferably non-swelling underlayment that can be a loose scroll or have its seam sealed. A swelling cover is placed over the underlayment using a seam that can be longitudinal or spiral to allow rapid deployment. The covering assembly for the control line or conduit is placed in the slot of the swelling element of the packer. The line or cable continues out opposed ends and can be secured to the tubular string with clamps. The control line can also be covered with a swelling material and forced into a groove that runs the length of the packer swelling element.
James R. Korte - Katy TX, US Kent A. Evans - Houston TX, US Dustin D. Ellis - Richmond TX, US John J. Thurston - Houston TX, US Anthony P. Foster - Katy TX, US Steve Rosenblatt - Houston TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
E21B 33/12
US Classification:
166179, 166387, 1662721, 277323, 277333, 277934
Abstract:
A swelling packer is covered with a material that is preferably in a tubular form and slipped over the swelling element to be shrink fit with applied heat. The material is formulated to break down at temperatures slightly below the expected downhole temperatures so that ideally the packer has about 48 hours of swelling delay which is normally a time period long enough to allow it to be properly located without it swelling so much as to cause it to be damaged by running in. Various polymers can be used to make an imperious covering for run in that on the way starts to break down. Ideally the material for the cover disappears about the time of sealing or shortly thereafter.
Robert O. Castillo - Stafford TX, US Anthony P. Foster - Katy TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
B23K 31/02
US Classification:
228115, 166179, 228116
Abstract:
A swelling element packer is made with internal rings that are either split or scrolled. After the swelling element is built on a temporary mandrel a longitudinal seam of a variety of designs is cut through the element. This allows the rapid deployment of the element on the tubular that will be a part of a string and will serve as the final mandrel. The assembly is then magnetic pulse welded or crimped so as to urge the open ends of the rings to move toward each other and become secured to each other and further opening the possibility of attaching parts on the ring itself to the underlying tubular by displacing or otherwise removing the swelling material that was between the ring and the final mandrel when the magnetic pulse process began. The rings can be embedded wholly within the element or can extend beyond the opposed ends or combinations of the two.
Sealing Feed Through Lines For Downhole Swelling Packers
Anthony P. Foster - Katy TX, US Robert O. Castillo - Stafford TX, US Ammar Munshi - Houston TX, US Edward T. Wood - Kingwood TX, US Gregory C. Badke - Houston TX, US Nervy Enrique Faria - Houston TX, US
Assignee:
Baker Hughes Incorporated - Houston TX
International Classification:
E21B 33/12
US Classification:
166188, 166195, 1662422, 1662423
Abstract:
A swelling element on a packer has a trough formed on a longitudinal axis. The control line or cable or conduit that needs to run along the string where the packer is mounted is first wrapped in a preferably non-swelling underlayment that can be a loose scroll or have its seam sealed. A swelling cover is placed over the underlayment using a seam that can be longitudinal or spiral to allow rapid deployment. The covering assembly for the control line or conduit is placed in the slot of the swelling element of the packer. The line or cable continues out opposed ends and can be secured to the tubular string with clamps. The control line can be covered with a swelling material and forced into a groove that runs the length of the packer swelling element.
Dr. Foster graduated from the Michigan State University College of Human Medicine in 1999. He works in Rockford, MI and specializes in Family Medicine. Dr. Foster is affiliated with St Marys Of Michigan Medical Center.
Spectrum Medical GroupLake Drive Surgical Center 4069 Lk Dr SE STE 210, Grand Rapids, MI 49546 6162851120 (phone), 6162851169 (fax)
Spectrum Medical GroupSpectrum Health Medical Group General Surgery 4069 Lk Dr Mc9029 STE 117, Grand Rapids, MI 49546 6162677601 (phone), 6162677200 (fax)
Education:
Medical School Wayne State University School of Medicine Graduated: 1977
Abdominal Hernia Appendicitis Inguinal Hernia Ventral Hernia Benign Neoplasm of Breast
Languages:
English
Description:
Dr. Foster graduated from the Wayne State University School of Medicine in 1977. He works in Grand Rapids, MI and 1 other location and specializes in General Surgery. Dr. Foster is affiliated with Butterworth Hospital, Spectrum Health Big Rapids Hospital, Spectrum Health Blodgett Campus and Spectrum Health Kelsey Hospital.
Anthony Foster (1705 April 1779), of Collon, Co Louth, was an Irish politician. File:FosterhouseColton2002.jpg. The Foster homestead at Collon, co. Louth ...
Wal-Mart Supercenter Greensboro, NC Jun 2013 to Aug 2013 Maintenance AssociateZaxbys Chicken Greensboro, NC Feb 2013 to Jun 2013 CookYMCA Reidsville, NC Oct 2011 to Feb 2013
Education:
Reidsville Senior High School Reidsville, NC Aug 2008 to May 2012 Diploma
Nov 2011 to 2000 Director of locationSonic Burger Drive-in Reidsville, NC Jun 2010 to Aug 2012 Team Leader/Cook and CashierNorth Carolina A & T State University Greensboro, NC 2008 to Jul 2008 Economics Department Office Assistant Intern
Education:
Reidsville Senior High School Reidsville, NC May 2012 High School Diploma in Digital Communications Systems CourseUpward Bound Summer Program Of North Carolina A & T State University Greensboro, NC 2008 to 2011
Name / Title
Company / Classification
Phones & Addresses
Anthony Foster Principal
5 A M Fire Inspection Services Business Services
9819 Chiselhurst Dr, Houston, TX 77065
Anthony Stephen Foster
Foster Group, LLC Provide Business Structure For Members Of John William Foster Sr
But while the Ballarat survivors made steps towards repairing their relationship with Cardinal Pell through the private meeting after which he delivered a handwritten statement, theres been no such closure for Anthony Foster, whose two daughters were abused by Catholic priest Father Kevin ODonnell
Date: Mar 04, 2016
Category: World
Source: Google
Vatican Cardinal Pell: Pedophile Priest 'Wasn't of Much Interest'
Australia's ABC News said Anthony Foster, whose daughters Emma and Katie were raped by Melbourne priest Father Kevin O'Donnell at an elementary school in the 1980s, told the cardinal: "I am a broken man."
Date: Mar 01, 2016
Category: World
Source: Google
Pell: The Vatican 'mucked things up' on sexual abuse
If we dont see humility the moment he comes in, I dont think well get the truth, Anthony Foster told Crux before the hearing begun. So we need humility, we need the truth, and we need action.
ANTHONY FOSTER: A national royal commission will provide the opportunity for victims in all states to achieve justice, to be able to tell their stories and hopefully to achieve proper recompense for the injuries and the hurt that they've suffered - and of course it's just so much better than a parli
Date: Nov 12, 2012
Category: World
Source: Google
Youtube
Anthony Foster Scene Pack! (logoless)
Duration:
2m 57s
CONTRARY AND UNBELIF IS THE EMEMIES OF THE CH...
1 Thessalonians 2:11-20 KJV As ye know how we exhorted and comforted a...
Duration:
1h 19m 9s
SACRED HEART GENERAL CONVENTION 2022 - NIGHT ...
THEME: BE RIGHTEOUS AND WEALTH SHALL BE YOUR INHERITANCE Proverbs 13:2...
Duration:
1h 1m 44s
UNSHAKABLE CONFIDENCE - MOUNT REFUGE TRIUMPHA...
Psalms 46:1-3 1 God is our refuge and strength, a very present help in...
Duration:
41m 57s
UNSHARKEADLE CONFIDENCE - MOUNT REFUGE TRIUMP...
Psalms 46:1-3 1 God is our refuge and strength, a very present help in...
Duration:
56m 5s
YOUR SET TIME TO LAUGH - SACRED HEART - P2
2 The kings of the earth set themselves, and the rulers take counsel t...