Sanjeev Gupta - San Jose CA, US Ajai Kapoor - San Jose CA, US Ravi Shankar - San Jose CA, US Corvin Bazgan - San Carlos CA, US Anthony Hoang - Milpitas CA, US
Assignee:
Realization Technologies, Inc. - San Jose CA
International Classification:
G06F 9/44 G06F 9/46
US Classification:
717102, 717100, 717105, 705 8
Abstract:
A method on a computer for providing critical chain-based project management is disclosed. The method includes generating a list of sequential time periods for a project comprising a plurality of tasks and calculating a number of tasks for each time period. The method further includes generating a graphic that visually indicates the number of tasks for each time period and a priority of each task and providing the graphic to a user.
Facilitation Of Multi-Project Management Using Task Hierarchy
Sanjeev Gupta - San Jose CA, US Ajai Kapoor - San Jose CA, US Ravi Shankar - San Jose CA, US Prakash Pati - San Jose CA, US Subramanian Muthu - Santa Clara CA, US Anthony Hoang - Milpitas CA, US Sridharan Chandrasekaran - San Jose CA, US
International Classification:
G06F009/44
US Classification:
717101000
Abstract:
A method on a computer for providing critical chain-based project management is disclosed. The method includes receiving at least one project plan for a project comprising a plurality of tasks and calculating a task priority for each of the plurality of tasks based on the at least one project plan. The method further includes receiving at least one sub-task for a first task of the plurality of tasks and assigning the at least one sub-task a task priority identical to the task priority of the first task. In one alternative, the method further includes receiving a new task priority for the first task, assigning the new task priority to the first task and assigning the new task priority to the at least one sub-task of the first task. The method may also include an interface to allow starting of sub-tasks only when the parent task is started.
Post Facto Identification And Prioritization Of Causes Of Buffer Consumption
Ajai Kapoor - San Jose CA, US Ravi Shankar - San Jose CA, US Xiangting Yuan - Pleasanton CA, US Anthony H. Hoang - Milpitas CA, US Prakash K. Pati - San Jose CA, US
Assignee:
Realization Technologies, Inc. - San Jose CA
International Classification:
G06Q 10/00
US Classification:
705301
Abstract:
Some embodiments provide a system for determining an aggregate delay associated with a task attribute value. During operation, the system can receive a set of projects, which include completed projects and currently executing projects. Next, the system can determine buffer consumption amounts associated with task chains in each project. A task chain can be a sequence of tasks in the project's task dependency network which ends in the project buffer. The buffer consumption amount associated with a task chain can be the amount of the project buffer that would have been consumed if the tasks in the task chain were the only tasks in the project. Next, the system can select a set of task chains based at least on the buffer consumption amounts. The system can then aggregate task delays for tasks in the set of task chains that are associated with the task attribute value.
Post Facto Identification And Prioritization Of Causes Of Buffer Consumption
Ajai Kapoor - San Jose CA, US Ravi Shankar - San Jose CA, US Xiangting Yuan - Pleasanton CA, US Anthony H. Hoang - Milpitas CA, US Prakash K. Pati - San Jose CA, US
Assignee:
Realization Technologies, Inc. - San Jose CA
International Classification:
G06F 9/46
US Classification:
718100, 715772
Abstract:
Some embodiments of the present invention provide systems and techniques for collecting task status information. During operation, the system can receive a status update for a task from a task manager through a GUI. Next, the system can determine whether the first status update for the task indicates that the task is delayed. If the status update indicates that the task is delayed, the system can request the task manager to indicate the help needed to resolve the task delay. Next, the system can receive a help needed descriptor from the task manager. Subsequently, the system can receive another status update for the task from the task manager, wherein the status update indicates that the help specified in the help needed descriptor is no longer required. Next, the system can determine an amount of delay associated with the help needed descriptor.
Post Facto Identification And Prioritization Of Causes Of Buffer Consumption
Ajai Kapoor - San Jose CA, US Ravi Shankar - San Jose CA, US Xiangting Yuan - Pleasanton CA, US Anthony H. Hoang - Milpitas CA, US Prakash K. Pati - San Jose CA, US
Assignee:
REALIZATION TECHNOLOGIES, INC. - San Jose CA
International Classification:
G06F 9/46
US Classification:
718100, 715772
Abstract:
Some embodiments of the present invention provide systems and techniques for determining a start delay and an execution delay for a task. During operation, the system can receive a status update for the task which indicates that the task has started execution. Next, the system can receive a second status update for the task which indicates that the task has completed execution. The system can then determine the start delay for the task by: determining an actual start time using the first status update; and determining a difference between the actual start time and the task's suggested start time. Next, the system can determine the execution delay for the task by: determining an actual execution duration using the first status update and the second status update; and determining a difference between the actual execution duration and the task's planned execution duration.
Name / Title
Company / Classification
Phones & Addresses
Anthony Hoang Professional Engineer
Hewlett Packard Co Electronic Computer Manufacturing
3495 Deer Crk Rd, Palo Alto, CA 94304 6508571501
Anthony T. Hoang
ALLTEL REPAIRS LLC
Anthony Hoang
SUNNY NAILS, INC
Anthony Hoang Information Technology Manager
Mount & Stoelker PC Attorneys Office · Electronic Computer Manufacturing
333 W San Carlos St, San Jose, CA 95110 4082797000, 6262965561, 4089981473
Houston Metro Urology 7777 SW Fwy STE 1032, Houston, TX 77074 7137719224 (phone), 7137781835 (fax)
Houston Metro Urology 16605 SW Fwy STE 250, Sugar Land, TX 77479 2819694221 (phone), 2813250242 (fax)
Education:
Medical School University of Texas Medical School at Houston Graduated: 2006
Procedures:
Cystourethroscopy Kidney Stone Lithotripsy
Conditions:
Benign Prostatic Hypertrophy Calculus of the Urinary System Erectile Dysfunction (ED) Prostate Cancer Prostatitis
Languages:
English Spanish Vietnamese
Description:
Dr. Hoang graduated from the University of Texas Medical School at Houston in 2006. He works in Sugar Land, TX and 1 other location and specializes in Urology. Dr. Hoang is affiliated with Houston Methodist Sugar Land Hospital and Memorial Hermann Southwest Hospital.
Northwell Health Physician PartnersUniversity Orthopaedics Associates 611 Northern Blvd STE 200, Great Neck, NY 11021 5167232663 (phone), 5163257192 (fax)
Languages:
English
Description:
Mr. Hoang works in Great Neck, NY and specializes in Orthopaedic Surgery. Mr. Hoang is affiliated with North Shore University Hospital and Northwell Health Long Island Jewish Medical Center.
Googleplus
Anthony Hoang
Work:
Michaels - Cashier, Replenishment Associate (2011) Giant Food of Landover, Maryland - Cashier, Produce Clerk (2010)
Education:
University of Virginia - Chemical Engineering
Tagline:
Tony the Tiger: Gooftrooper and Koala Bear
Anthony Hoang
Tagline:
Dr. Awesome... enough said
Anthony Hoang
Anthony Hoang
Anthony Hoang
Anthony Hoang
Anthony Hoang (Stormbladex)
Anthony Hoang
Youtube
2015 Anthony Hoang Ninja training video
Duration:
1m 21s
PHNG S 180 NM THNH LP GIO H TRUNG C ( 1842 - ...
Duration:
14m 34s
Average Superstar T.V. (Episode #26) with 'An...
Hello Hello and welcome to Average Superstar T.V. This week we welcome...
Duration:
42m 51s
Anthony Hoang: 2014 NBA Draft Prospect highli...
5'9" Guard NBA Comparison: Jeremy Lin Strengths: Can run from one end ...