Dr. Buck graduated from the University of Texas Medical School at Houston in 1985. He works in Old Town, ME and specializes in Pediatrics. Dr. Buck is affiliated with Eastern Maine Medical Center and St Joseph Hospital.
Dr. Buck graduated from the University of Minnesota Medical School at Minneapolis in 1985. He works in Saint Cloud, MN and specializes in Family Medicine.
Us Patents
Lighting Control Having An Idle State With Wake-Up Upon Actuation
Jeremy Nearhoof - Lansdale PA, US Gregory Altonen - Easton PA, US Christopher Buck - Bethlehem PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
G08B 5/00
US Classification:
3408154, 315291, 315362
Abstract:
A load control device comprises an actuator for controlling a connected lighting load and a plurality of status indicators for displaying the intensity of the lighting load as feedback to a user. One or more of the status indicators are illuminated to a bright active level when the actuator is actuated. After a predetermined amount of time, the intensity of the status indicators is faded one of two dim levels depending upon whether the lighting load is on or off. Accordingly, the load control device will “wake up”, i. e. , the status indicators will illuminate to the bright active level, upon another actuation of the actuator.
Donald Mosebrook - Coopersburg PA, US Daniel F. Carmen - Schnecksville PA, US Christopher Buck - Bethlehem PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
H05B 41/16
US Classification:
315246
Abstract:
A multiple location dimming system comprises a plurality of dimmers coupled between an AC power source and a lighting load. Each of the plurality of dimmers is operable to control the intensity of the lighting load and comprises a controllably conductive device, e. g. , a triac. The triacs of the plurality of dimmers are coupled in parallel electrical connection. Only an active one of the dimmers is operable to conduct a load current to the lighting load at any given time. A passive dimmer is operable to monitor the voltage across its triac in order to determine when the active dimmer is firing its triac. Accordingly, the passive dimmer is operable to fire its triac before the active dimmer fires its triac in order to “take over” control of the lighting load from the active dimmer to become the next active dimmer. Further, the passive dimmer is operable to determine the amount of power being delivered to the load and display this information on one or more status indicators.
James P. Steiner - Royersford PA, US Cyril Baby - Conshohocken PA, US Christopher Buck - Bethlehem PA, US Daniel F. Carmen - Schnecksville PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
H05B 37/00
US Classification:
315295, 315308, 315362
Abstract:
A multiple location load control system comprises a main device and remote devices, which do not require neutral connections, but allow for visual and audible feedback at the main device and the remote devices. The main device and the remote devices are adapted to be coupled in series electrical connection between an AC power source and an electrical load, and to be further coupled together via an accessory wiring. The remote devices can be wired on the line side and the load side of the load control system, such that the main device is wired “in the middle” of the load control system. The main device is operable to enable a charging path to allow the remote devices to charge power supplies through the accessory wiring during a first time period of a half-cycle of the AC power source. The main device and the remote devices are operable to communicate with each other via the accessory wiring during a second time period of the half-cycle.
Donald Mosebrook - Coopersburg PA, US Daniel F. Carmen - Schnecksville PA, US Christopher Buck - Bethlehem PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
G05F 1/00 H05B 37/02
US Classification:
315291, 315307
Abstract:
A multiple location dimming system comprises a plurality of dimmers coupled between an AC power source and a lighting load. Each of the plurality of dimmers is operable to control the intensity of the lighting load and comprises a controllably conductive device, e. g. , a triac. The triacs of the plurality of dimmers are coupled in parallel electrical connection. Only an active one of the dimmers is operable to conduct a load current to the lighting load at any given time. A passive dimmer is operable to monitor the voltage across its triac in order to determine when the active dimmer is firing its triac. Accordingly, the passive dimmer is operable to fire its triac before the active dimmer fires its triac in order to “take over” control of the lighting load from the active dimmer to become the next active dimmer. Further, the passive dimmer is operable to determine the amount of power being delivered to the load and display this information on one or more status indicators.
James P. Steiner - Royersford PA, US Cyril Baby - Conshohocken PA, US Christopher Buck - Bethlehem PA, US Daniel F. Carmen - Schnecksville PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
H05B 37/00
US Classification:
315295, 315308, 315362
Abstract:
A multiple location load control system comprises a main device and remote devices, which do not require neutral connections, but allow for visual and audible feedback at the main device and the remote devices. The main device and the remote devices are adapted to be coupled in series electrical connection between an AC power source and an electrical load, and to be further coupled together via an accessory wiring. The remote devices can be wired on the line side and the load side of the load control system, such that the main device is wired “in the middle” of the load control system. The main device is operable to enable a charging path to allow the remote devices to charge power supplies through the accessory wiring during a first time period of a half-cycle of the AC power source. The main device and the remote devices are operable to communicate with each other via the accessory wiring during a second time period of the half-cycle.
James P. Steiner - Royersford PA, US Cyril Baby - Conshohocken PA, US Christopher Buck - Bethlehem PA, US Daniel F. Carmen - Schnecksville PA, US
Assignee:
LUTRON ELECTRONICS CO., INC. - Coopersburg PA
International Classification:
H05B 37/02
US Classification:
315287
Abstract:
A multiple location load control system comprises a main device and remote devices, which do not require neutral connections, but allow for visual and audible feedback at the main device and the remote devices. The main device and the remote devices are adapted to be coupled in series electrical connection between an AC power source and an electrical load, and to be further coupled together via an accessory wiring. The remote devices can be wired on the line side and the load side of the load control system, such that the main device is wired “in the middle” of the load control system. The main device is operable to enable a charging path to allow the remote devices to charge power supplies through the accessory wiring during a first time period of a half-cycle of the AC power source. The main device and the remote devices are operable to communicate with each other via the accessory wiring during a second time period of the half-cycle.
Mobile And/Or Cloud Based Tool For Enabling Accurate Information Of New And Retrofit Projects
Christopher Buck - Bethlehem PA, US Gerard Darville - Macungie PA, US Hagen Denton - Royersford PA, US Mark Law - Bethlehem PA, US Brent Protzman - Easton PA, US
International Classification:
G06Q 50/08 G06F 17/50
US Classification:
705 723
Abstract:
A real-time, mobile, energy savings and cost estimation tool may be provided. The energy savings and cost estimation tool may be implemented on a mobile electronic device, such as, but not limited to a laptop computer, tablet, or a smart phone, for example. A user may create a project and define project information using the energy savings and cost estimation tool while at the project site. For example, the user may discuss the project with a potential customer, ask questions about the project to be created or retrofitted, walk around the project site, and enter the project information into the energy savings and cost estimation tool. Using the project information gathered, the energy savings and cost estimation tool may provide real-time feedback, such as an energy usage audit, an energy usage solution design, an energy analysis, and/or a return on investment (ROI) analysis for the project, to the user.
- Coopersburg PA, US Cyril Baby - Conshohocken PA, US Christopher Buck - Bethlehem PA, US Daniel F. Carmen - Schnecksville PA, US
Assignee:
Lutron Electronics Co., Inc. - Coopersburg PA
International Classification:
H05B 37/02
Abstract:
A multiple location load control system comprises a main device and remote devices, which do not require neutral connections, but allow for visual and audible feedback at the main device and the remote devices. The main device and the remote devices are adapted to be coupled in series electrical connection between an AC power source and an electrical load, and to be further coupled together via an accessory wiring. The remote devices can be wired on the line side and the load side of the load control system, such that the main device is wired “in the middle” of the load control system. The main device is operable to enable a charging path to allow the remote devices to charge power supplies through the accessory wiring during a first time period of a half-cycle of the AC power source. The main device and the remote devices are operable to communicate with each other via the accessory wiring during a second time period of the half-cycle.
Hatch Mott MacDonald Buffalo, NY May 2010 to Aug 2012 Civil Engineering Intern / Construction Inspector
Education:
Lehigh University Bethlehem, PA 2009 to 2013 BS in Civil Engineering
Skills:
Skilled in AutoCAD, MathCAD, Matlab, SAP 2000 and Microsoft Office. ACI Concrete Field Testing Technician certified. Knowledgeable in structural analysis, reinforced concrete design, steel design, pre-stressed concrete design, foundation design, and retaining wall design.
Name / Title
Company / Classification
Phones & Addresses
Mr. Christopher Buck Regional Vice President
Enterprise Rent-A-Car Alamo Rent-A-Car. Enterprise Holdings. Enterprise Rent A Car Auto Renting & Leasing
portraits from time to time), my first thought upon seeing the new Newsweek cover photo of Michele Bachmann was, "What an awful photograph." Technically speaking, that is. I've done better work in my home studio, and I'm not nearly the photographer Christopher Buck is (the freelancer who took that shot).Given that the Newsweek editors had at least one better photo to choose from (and knowing Christopher Buck's work, probably more), there are only two explanations for why they chose the awful shot they did. One: they don't know a good photo from a bad one (highly unlikely), or 2: they deliberately w
Date: Aug 10, 2011
Category: U.S.
Source: Google
Youtube
Tom Zuba's Reflections on Healing, 4 of 4 (ww...
Tom Zuba, grief guide, author and inspirational speaker explains the d...
Category:
Education
Uploaded:
15 Oct, 2010
Duration:
1m 50s
Wizard World 2010: Hanging with "Peter Brady ...
Wizard World 2010: Hanging with "Peter Brady aka Christopher Knight" &...
Category:
People & Blogs
Uploaded:
14 Jun, 2010
Duration:
6m 47s
Onefeather Journal Radio, HHF & OM Times Radi...
An Excerpt from the Christopher Buck Interview on April 15th on OM Tim...
Category:
Nonprofits & Activism
Uploaded:
15 Apr, 2010
Duration:
5m 5s
Haiku For Japan Contest
For more information on how to share your Haiku with Japan and the con...
Category:
Education
Uploaded:
22 Mar, 2011
Duration:
2m 24s
I BELIEVE
Please join with us in sending out a message of Hope from the Heart! W...
Category:
Nonprofits & Activism
Uploaded:
13 Jan, 2008
Duration:
3m 33s
UBC Radio Interview with HHF President Christ...
Uganda Broadcasting Company interview with Humanity healing Foundation...
Dominican School Taipei GA 1969-1971, Chaffins Elementary School Holden MA 1971-1972, Indian Hill School Worcester MA 1972-1973, St. Patrick School Brooklyn NY 1973-1976
Community:
Mark Burns, Mary Schwab, Alan Craig, Scott Lin, George Hayes
Googleplus
Christopher Buck
Work:
Marathon Consulting, LLC - Sr. Consultant (2011) CjB Consulting, LLC - President / CEO (2007-2011)
Tagline:
I'm married with child, my body creaks and I need to be watered 3-4 times a day. Otherwise, life is good...