Daniel William Jencka

age ~69

from Albuquerque, NM

Also known as:
  • Daniel W Jencka
  • Daniel J Jencka
  • Prudence C Jencka
  • Prudence C Calabrese
  • Daniel Jenka
  • Daniel Prudence
Phone and address:
4504 San Andres Ave NE, Albuquerque, NM 87110

Daniel Jencka Phones & Addresses

  • 4504 San Andres Ave NE, Albuquerque, NM 87110
  • Las Vegas, NV
  • Las Vegas, NM
  • 1737 Rogue Isle Ct, Carlsbad, CA 92008 • 7607301424 • 7607200483
  • 1701 Tamarack Ave, Carlsbad, CA 92008
  • Atlanta, GA
  • Carpinteria, CA
  • Oceanside, CA
  • 1737 Rogue Isle Ct, Carlsbad, CA 92008

Work

  • Position:
    Administrative Support Occupations, Including Clerical Occupations

Education

  • Degree:
    High school graduate or higher
Name / Title
Company / Classification
Phones & Addresses
Daniel Jencka
Principal
Amigos De Rios Gallina
School/Educational Services
PO Box 248, Gallinas, NM 87731
9 Castle Ln, Gallinas, NM 87731

Resumes

Daniel Jencka Photo 1

Project Manager

view source
Location:
P/O Box 2824, Las Vegas, NM
Industry:
Renewables & Environment
Work:
Array Technologies, Inc.
Project Manager

Energy Concepts Corporation Apr 1, 2014 - May 2015
Sales Manager

Dpw Solar Electric Nov 2011 - Apr 2014
Technical Sales and Integration and Project Management

Luna Community College Jan 2006 - Aug 2011
Adjunct Instructor

Gew Mechanical Inc. Jul 2010 - Jul 2011
Sales and Marketing
Education:
Oakland University 1982 - 1987
Bachelors, Music, Philosophy
Skills:
Solar Energy
Energy
Solar Thermal
Energy Efficiency
Alternative Energy
Customer Service
Renewable Energy
Construction
Project Management
Sustainable Energy
Solar Pv
New Business Development
Public Speaking
Negotiation
Microsoft Word
Research
Strategic Planning
Construction Management
Microsoft Excel
Contract Negotiation
Energy Conservation
Powerpoint
Outlook
Photoshop
Teaching
Html
Editing
Architectural Design
Layout
Marketing
Music
Game Design
Mac Os
Windows
Canvas Design Software
Harpsichordist
17Th and 18Th Century Music Performance Practices
English
C++
Interests:
Classical Music
Board Game Design
Hiking and Camping
Woodworking and Construction
Economic Empowerment
Politics
Science
Education
Environment
In Line Skating
Bicycling
Arts and Culture
Science and Technology
Human Rights
Travel
Philosophy
Daniel Jencka Photo 2

Sales Manager At Green Energy Works

view source
Location:
Albuquerque, New Mexico Area
Industry:
Renewables & Environment

Us Patents

  • Holder With Retaining Device For Compact Disc And Other Media Cases

    view source
  • US Patent:
    61933368, Feb 27, 2001
  • Filed:
    Nov 28, 1995
  • Appl. No.:
    8/563444
  • Inventors:
    Daniel Jencka - Atlanta GA
  • International Classification:
    A47B 8106
  • US Classification:
    312 957
  • Abstract:
    A holder (42) with retaining device for organizing compact disc cases and other such substantially rectangular media cases. The retaining device allows deposited items to be placed solitarily or adjacently in any available location, to be relocated simply by sliding them sideways, saves the vacant spaces left by withdrawn items, and will accommodate a variety of media case types, including compact disc cases of the single, multiple and slip-cased variety. A preferred embodiment of the holder has a substantially rectangular storage area (34) defined in part by opposed upper and lower shelves (36 & 40) located adjacent to an access opening (32) on the front side of the holder through which compact disc cases (50) and other such items are deposited in a side-by-side, book-like manner, coming to rest on and perpendicular to the interior surface of the lower shelf (40). The back wall (38) serves to stop deposited items from exiting out the rear side of the holder. The retaining device has two specialized components, an engagement member (18) and a guide (10) (which in a preferred embodiment of the invention are simultaneously formed as a unified device,) which are located on the interior side of the upper shelf (36), running parallel to the access opening (32) along the entire length of the storage area (34) so as to oppose the upper, proximate sides of deposited items.

Youtube

The Voice of Fashion | Mathena Jencka | TEDxY...

As Gianni Versace said: don't make fashion own you, but you decide wha...

  • Duration:
    10m 41s

Janacek - Violin Sonata. Daniel Kurganov, Vio...

Excerpt from a recital for the "Songs4Brody" cancer benefit Leo Janek ...

  • Duration:
    4m 42s

The Importance of History Class | Daniel Spee...

Daniel Speer, a senior here at Upper St. Clair High School, highlights...

  • Duration:
    6m 58s

J-Spring 2021: Daniel Bryant - Debugging Jav...

Many Java-based organizations adopt cloud native development practices...

  • Duration:
    31m 30s

The Rick Jensen Show: IRA rules we can be tha...

Dan White keeps listeners in the Philadelphia and Delaware Region up-t...

  • Duration:
    6m 33s

Java Champion Insights with Daniel De Luca

Cassandra Clark, Java Champions Program Manager, interviews Java Champ...

  • Duration:
    3m 39s

Facebook

Daniel Jencka Photo 3

Dan Jencka

view source
Friends:
Donald Konen, Kevin Gillen, Chris McClain, Megan Henkels, Jean-Jacques Pasquin

Get Report for Daniel William Jencka from Albuquerque, NM, age ~69
Control profile