Chuck E. Kallal - Ann Arbor CA Mike W. Messick - Whitmore Lake MI Kevin P. Aretha - Saline MI Jason A. McLees - Northville MI David J. Gee - Ann Arbor MI Richard L. Mahn - Ann Arbor MI Don C. Stokes - Ann Arbor MI
Assignee:
Steeplechase Software, Inc. - Ann Arbor MI
International Classification:
G05B 1101
US Classification:
700 21
Abstract:
A software logic controller using flowchart programming includes exception handling elements for handling exception conditions in a manufacturing process. Exception handling is programmed using a Begin Exception element to start monitoring the occurrence of a specific exception condition and an End Exception element to stop the monitoring process. Monitoring is conducted once during every scan cycle of the computer as long as the Begin Exception element is still active.
Digital Communication Network With A Moderator Station Election Process
Jonathan R. Engdahl - Saline MI Mark A. Lucak - Saline MI David J. Gee - Ann Arbor MI Paul Kucharski - Saline MI
Assignee:
Allen-Bradley Company, Inc. - Milwaukee WI
International Classification:
H04L 1224
US Classification:
370 17
Abstract:
A moderator on a communication network periodically transmits a set of parameters for a protocol that is used to communicate over the network. Each node on the network compares the set of protocol parameters from the moderator to a set of parameters stored in that node. If the sets of parameters at a given node do not match, that given node ceases transmitting messages over the network until either the set of protocol parameters from the moderator match the stored set of parameters, or a matching set of parameters is stored in the node. Typically the active node that is assigned the lowest numerical network address functions as the moderator. However, an automatic process is utilized to prevent a node with a non-matching set of the protocol parameters from becoming the moderator for more than a brief period of time. An override procedure is provided to force all the nodes on the network to adopt a common set of protocol parameters in the event that the automatic process fails.
License Records
David Raymond Gee
License #:
104612 - Expired
Issued Date:
Mar 17, 1994
Renew Date:
Sep 30, 1995
Expiration Date:
Sep 30, 1995
Type:
Registered Nurse
David W Gee
License #:
40687 - Active
Category:
EMS Licensing
Issued Date:
May 2, 2016
Expiration Date:
Jun 30, 2018
Type:
First Responder (EMR)
David A Gee
License #:
34EI00628600 - Expired
Category:
Electrical Contractors
Issued Date:
Jan 6, 1980
Expiration Date:
Mar 31, 2009
Type:
Electrical Contractor
David A Gee
License #:
34EI00628600 - Expired
Category:
Electrical Contractors
Issued Date:
Jan 6, 1980
Expiration Date:
Mar 31, 2009
Type:
Electrical Contractor
David A Gee
License #:
34EI00628600 - Expired
Category:
Electrical Contractors
Issued Date:
Jan 6, 1980
Expiration Date:
Mar 31, 2009
Type:
Electrical Contractor
David A Gee
License #:
34EI00628600 - Expired
Category:
Electrical Contractors
Issued Date:
Jan 6, 1980
Expiration Date:
Mar 31, 2009
Type:
Electrical Contractor
Name / Title
Company / Classification
Phones & Addresses
David Gee DIRECTOR
MARSULEX INC WHOLESALE AND DISTRIBUTION OF SULPHURIC ACID AND RELATED CHEMICALS
LondonInterim Waste Strategy Programme Manager at Essex... Past: Interim Project Manager - Online Publications & Logistics at Home Office During my career I’ve worked in both public and private sector organisations at director and chief executive level, and in interim management roles. I’ve... During my career I’ve worked in both public and private sector organisations at director and chief executive level, and in interim management roles. I’ve also run my own business. These days I work mainly with public sector clients particularly on waste management strategy. But I also work with...