Commanding Officer at Central Indiana Young Marines, President at Heffner Plumbing
Location:
Indianapolis, Indiana
Industry:
Construction
Work:
Central Indiana Young Marines - Indianapolis, Indiana Area since Feb 2007
Commanding Officer
Heffner Plumbing - Indianapolis, IN since Jan 2001
President
Metzler Plumbing Apr 1999 - Jan 2001
Plumbing Service Manager
American Residential Services Mar 1997 - Apr 1999
Plumbing Service Technician
Paul Henderson Plumbing Jun 1997 - Jun 1998
Plumbing Apprentice
Education:
Lushin & Associates 2006 - 2008
Somerset CPAs 2001 - 2006
MBA, Business Development/Administration
Mechanical Skills 1993 - 1997
Washington College 1979 - 1980
Skills:
Sump Pumps Toilets
Honor & Awards:
2009 Contractor of the Year for the Greater Indianapolis PHCC, 2007 Adult Leader of the Year for Central Indiana Young Marines, Angie's List Super Service Award for 2004, 2005, 2006, 2007 and 2008.
Peter M Politsky - Warren OH David C. Heffner - Williamsfield OH Robert S. Lesigonich - Chardone OH Thomas F. Cunningham - Rochester Hills MI
Assignee:
Delphi Technologies, Inc. - Troy MI
International Classification:
H01R 13502
US Classification:
439686, 439492, 439493
Abstract:
A terminal side load electrical connector positions a series of terminals of a flex circuit into a core in unison. The core has a peripheral surface extending between a contact surface and a conductor surface. The terminals are assembled to the core through the peripheral surface. A housing has a conductor opening opposite to a contact opening. The core with the pre-assembled terminals insert into the housing through the conductor opening. The contact surface of the core is exposed through the contact opening of the core. The housing engages the peripheral surface of the core thereby preventing the disengagement of the terminals from the core.
Containment Device For Contaminated Building Demolition
A containment device for contaminated building demolition. A pre-engineered rigid steel frame building is supported on rail trucks movable on railroad tracks. The railroad tracks are positioned on opposite sides and along the length of the contaminated building to be demolished. The rigid steel frame building has one open end and is sized larger than the width and height of the contaminated building. This allows a portion of the contaminated building to be movably enclosed by the pre-engineered building. A flexible liner material inside the pre-engineered building, at the open end attached to the contaminated building, and at the bottom of the pre-engineered building draped to be in contact with the ground seals off the interior of the pre-engineered building to prevent the release of contaminated particles during demolishing operations. A hoist and cable are used to move the pre-engineered building on the railroad tracks. After the covered portion of the contaminated building is demolished and the area remediated, the pre-engineered building is moved on the railroad tracks to cover another portion of the contaminated building.
Youtube
Story of The Stars, written and sung by David...
David Heffner sings his music and lyrics "Story of The Stars" at the 2...
Duration:
5m 20s
David Heffner and Treeboy Discuss Sump Pumps ...
David Heffner and Treeboy discuss the importance of a battery back-up ...
Duration:
2m 55s
Disposal Do's And Don'ts From David Heffner a...
David Heffner and Tim "Treeboy" Bush from WTHR Channel 13 discuss thin...
Duration:
4m 35s
Winter Plumbing Tips From David Heffner and T...
David Heffner and Treeboy discuss some things to consider with your pl...