Skills:
KEY PROJECTS and SELECTED ACCOMPLISHMENTS Tuscany Homes, Delray Beach, Fl - Complex of Luxury Custom Homes, 5,600 sqft, 2 story high each. Acted as site PM and assisted in the construction management. Residential construction development, coordinated and managed labors, and all other trades during the construction phases. Managed to decrease construction costs to up to 15% High-End Remodeling, Miami, Fl - Contracted for more than 20 High End Remodeling Projects on High Rises from the Miami area, including, Marquee Bldg, 900 Biscayne and Paramount Bay. Worked along known Designers and group of Architects to achieve a maximum detailed Renovation. Tasks included, new flooring, Plumbing, Electricity, framing, drywall, finish, paint and Carpentry. 240 Galen Drive, Key Biscayne, Fl -Structural and Geotechnical Repairs at a 4 Story Residential Building Estimated, Sold and Managed project. Coordinated and Supervised more than 15 labors, and all trades during the settlement remediation, soil stabilization and structural repairs of the structure. Increase the value of the contract from $460,000 to $1,100,000, with a final profit of a 26%. Forest View Estates, Dania Beach, Fl - 31 Single Family homes, 2 story-Each (4,500 sqft each) Acted as PM, planned, organized and assisted in the construction management. Overall residential construction development, coordinated and managed labors, and all trades for the construction of masonry and reinforcement concrete walls, elevated slabs, concrete, steel beam and column erection and interior work, such as flooring, drywall, electrical and plumbing. Finished 2 weeks earlier than initially scheduled Geotechnical field inspections and supervisions, progress and technical reports, site preparation, foundations, and fast-track solutions in, high-rise towers, waterfront redevelopment projects and retail center throughout the United States, as well as internationally: o Met 2 and 3 Development, Miami, FL - Augercast piling installation supervision (Approx. 600 - 36 diam., high capacity piles), geotechnical investigations, and foundation design o The Axis, Miami, FL - Augercast piling installation supervision (Approx. 1000 - 24 and 18 diam. piles) o Atlantis Resort, Paradise Island, Bahamas - Augercast piling installation supervision (Approx. 300 - 16 and 18 diam. piles) o Chub Cay Resort, Chub Cay, Bahamas - Boring Inspections, geotechnical investigations. o Newton Creek, Water Treatment Plant, Queens, NY - Friction Pile (Approx 1200 - high capacity) and Shafts (Approx 200 - 6 to 10 ft diam. - high capacity piles) installation supervision and foundation design.