Emory L. Frey - Duncan OK David W. Looper - Duncan OK Eugene J. Daunis - Duncan OK
Assignee:
Halliburton Company - Duncan OK
International Classification:
E21B 2106 G01N 1104
US Classification:
73151
Abstract:
A rheology test system includes a self-propelled vehicle, a computer contained in the vehicle and a rheology flow loop skid mounted in an outboard storage compartment of the vehicle. The rheology flow loop skid includes an obliquely mounted helical conduit through which laminar flow is maintained. The helical loop is mounted on a base near an inboard side thereof, and instrumentation is mounted on an outboard side of the base so that the apparatus can be readily used while mounted on the vehicle. Improved connecting pipes provide a more compact construction and a more easily assemblable and disassemblable construction.
Multi-Function Apparatus For Testing A Sample Of Material
Dwight L. Freese - Duncan OK Emory L. Frey - Duncan OK Randall B. Cogbill - Duncan OK
Assignee:
Halliburton Company - Duncan OK
International Classification:
G01N 1114
US Classification:
73 641
Abstract:
A compact, transportable apparatus includes test equipment for operating on a sample of slurry within a single container to determine the compressibility, thickening time, and static gel strength of the sample. The static gel strength test is particularly performed with a load cell vertically moved along a lead screw, which load cell is directly connected to a drive mechanism for driving a paddle at a very slow speed through the sample.
A track system for a work vehicle includes a first sprocket having a first diameter. The first sprocket is configured to be coupled to a drive system of the work vehicle, and the first sprocket is configured to engage a metal track and to drive the metal track in rotation. The track system also includes a second sprocket having a second diameter. The second sprocket is configured to be coupled to the drive system of the work vehicle, and the second sprocket is configured to engage a rubber track and to drive the rubber track in rotation. In addition, the first and second sprockets are configured to engage a mounting system, the mounting system is configured to interchangeably couple the first and second sprockets to the drive system, and the second diameter of the second sprocket is greater than the first diameter of the first sprocket.
Boom Lock System For Work Machine And Associated Method
- New Holland PA, US Emory L. FREY - Clearwater KS, US John M. MOFFITT - Wichita KS, US Lance A. TAYLOR - Wichita KS, US Scott M. TIMKEN - Bel Aire KS, US
Assignee:
CNH America LLC - New Holland PA
International Classification:
E02F 3/43 E02F 3/34 E02F 9/24
US Classification:
414685, 414815
Abstract:
A work vehicle includes a frame including generally upwardly extending laterally spaced side members. A boom structure includes a pair of arms pivotably connecting the boom structure to the frame. A pressurized fluid system is operably associated with the boom structure for raising and lowering jointly each of the arms along a path of travel adjacent a corresponding side member. A stop member selectably extends outwardly from at least one of the side members between a locking position and a retracted position, the locking position extending at least a portion of the stop member into the path of travel of a corresponding arm of the boom structure to prevent a lowering movement of the boom structure beyond a predetermined height. A boom lock system prevents the fluid system from applying a fluid force to lower the boom structure when the stop member is in the locking position.
Youtube
Navigating the Neurocognitive Clinic | Emory ...
Join us every Tuesday at 2pm/ET for BrainTalk Live! In this session, w...
Duration:
56m 4s
Joe DeVito In Studio and FRIDAY Annie Frey S...
FRIDAY: Joe DeVito in studio and FRIDAY YOUTUBE LIVE CHAT: Which cast ...
Duration:
2h 54m 25s
Emory Psychiatry Residency Schedule
Learn about what your schedule will look like in all four years of the...
Duration:
10m 1s
Euphonium Solo: "Rule Britannia"
Adam Frey performs with the Georgia Brass Band during the 2010 Interna...
Duration:
8m 53s
The Hidden History of the Cold War: Anti-Fasc...
Part 1: ORIGINAL Part 2:...
Duration:
8h 24m 15s
July 15: Family Friday Webinar - Housing, Din...
Emory isn't just a place where students learn, it's also the place stu...