HSE coordinator Chevron PDC new build drill ships projects at Chevron, Off shore safety manager at Moody International
Location:
Geoje, Gyeongsangnam-do, Korea
Industry:
Oil & Energy
Work:
Chevron - Geoje, Gyeongsangnam-do, Korea since Nov 2012
HSE coordinator Chevron PDC new build drill ships projects
Moody International - GMO since Jan 2009
Off shore safety manager
Deep Gulf Energy - block 506 GOM Mar 2012 - 2012
HSE Drilling Noble Jim Day
Chevron - Tahiti green caynon 641 Nov 2010 - Sep 2012
HSE Commissioning consultant
Chevron 2009 - 2011
HSE
Education:
OHSA Academy 2012 - 2012
700 132 hr program, safety
San Jacinto College 1980 - 1984
NA, Votech Arts
University of Oklahoma
- ZURICH, CH Jonathan Neil BRINGUIER - Carlsbad CA, US Ryan James ORSI - San Diego CA, US Forrest James BROWN - San Diego CA, US Alexandre DUPUY - San Diego CA, US
International Classification:
H01Q 7/00 H01Q 1/48 H01Q 5/307 H01Q 1/38
Abstract:
An antenna system is provided, including a first antenna, a second antenna, a ground plane, and a resonant isolator located proximate to the first antenna and the second antenna. The resonant isolator is coupled to the ground plane at or proximate to one current null point created by a first antenna and at or proximate to a second current null point created by a second antenna, and is configured to isolate the first antenna from the second antenna at a resonance. In some cases, the resonant isolator may include at least two conductive portions that may be substantially parallel to one another. The resonant isolator may also include an active tuning element that may change the resonance at which the resonant isolator de-couples the two antennas. In some cases, each of the antennas may be a capacitively-coupled compound loop antenna.