Emergency Physicians Of Central Florida 2906 17 St, Saint Cloud, FL 34769 3218415236 (phone), 4078926128 (fax)
Education:
Medical School Texas Tech University Health Science Center School of Medicine - Lubbock Graduated: 1995
Languages:
English
Description:
Dr. Garrison graduated from the Texas Tech University Health Science Center School of Medicine - Lubbock in 1995. He works in Saint Cloud, FL and specializes in Emergency Medicine. Dr. Garrison is affiliated with St Cloud Regional Medical Center.
- Houston TX, US Gregory William GARRISON - Dallas TX, US
Assignee:
Halliburton Energy Services ,Inc. - Houston TX
International Classification:
E21B 34/06 E21B 33/12
Abstract:
A system for use in completing a wellbore includes a portion of a workstring extending into the wellbore such that a first annulus is created between the workstring and a portion of the wellbore. The portion of the workstring is inserted to a depth corresponding to a base, such as a sump packer that defines a lower boundary of the completion zone. The zone of deployment may be sealed uphole by a second packer included in the workstring. A service tool having an inner sleeve, an outer sleeve, and a rotating mandrel positioned therebetween is provided to deliver fluids and execute completion operations as facilitated by rotation of the mandrel. Rotation of the mandrel allows for control of multiple fluid flow paths, each of which may correspond to a completion process within the zone, without displacement of the service tool in an uphole or downhole direction.
- Houston TX, US William Mark Richards - Flower Mound TX, US Joshua Max Hornsby - Keller TX, US Gregory William Garrison - Dallas TX, US James Ho - Carrollton TX, US
International Classification:
E21B 47/09 E21B 23/02 E21B 47/14 E21B 47/18
Abstract:
Assemblies and methods of use are disclosed for determining a position of a body within a tubing section. A signal generator coupled to the body is operable to generate a pressure wave in response to detecting a detectable portion of the tubing section when the body is moved relative to the tubing section.
- HOUSTON TX, US Thomas Jules Frosell - Irving TX, US Gregory William Garrison - Dallas TX, US Tyson Harvey Eiman - Frisco TX, US Syed Hamid - Dallas TX, US Colby Munro Ross - Dallas TX, US
A method and apparatus that includes an elongated base pipe having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; and a pressure maintenance device disposed in the base pipe and comprising: a flow path that extends between the internal region and the external region; and a valve having a gas charged chamber, the valve allowing the flow of a fluid from the internal region to the external region through the first flow path when a pressure differential between a pressure associated with the internal region and a pressure associated with the gas charged chamber is less than a maximum pressure threshold and when a pressure differential between the external region and the pressure associated with the gas charged chamber is greater than a minimum pressure threshold.
Downhole Pressure Maintenance System Using A Controller
- HOUSTON TX, US Syed Hamid - Dallas TX, US Gregory William Garrison - Dallas TX, US Colby Munro Ross - Carrollton TX, US William Mark Richards - Flower Mound TX, US Thomas Jules Frosell - Irving TX, US
International Classification:
E21B 47/06 E21B 43/14 E21B 43/12
Abstract:
A method and apparatus that includes positioning a completion string that has an internal passageway and that has an external surface that at least partially defines an external region within a wellbore; isolating a zone of the external region from a wellbore hydrostatic pressure; measuring a pressure within the external region of the isolated zone; determining whether the pressure within the external region of the isolated zone is within a predetermined pressure range; and operating a valve that controls a flow of a fluid through a flow path from the internal region to the external region of the isolated zone when the pressure within the external region is outside of the predetermined pressure range.
Shifting Tool Assembly That Facilitates Controlled Pressure Equalization
- Houston TX, US Gregory William Garrison - Dallas TX, US
Assignee:
Halliburton Energy Services, Inc. - Houston TX
International Classification:
E21B 34/10 E21B 33/12 E21B 47/06 E21B 34/14
Abstract:
An exemplary downhole system includes a completion string positioned within a wellbore and providing at least an upper seal bore and a downhole device that includes a sliding sleeve. A service tool is extendable within the completion string and includes a shifting tool assembly and provides a mandrel, a shifting tool coupled to the mandrel, and upper equalization seals arranged on the mandrel and sealingly engageable with the upper seal bore. The shifting tool is engageable with the sliding sleeve to move the downhole device at least partially between a closed position, where a pressure differential between a subterranean formation and an interior of the completion string is assumed by primary sealing elements of the downhole device, and an open position, where the pressure differential is assumed by at least the upper equalization seals.
- Houston TX, US William Mark Richards - Flower Mound TX, US Joshua Max Hornsby - Keller TX, US Gregory William Garrison - Dallas TX, US James Ho - Carrollton TX, US
International Classification:
E21B 47/09 E21B 47/14
Abstract:
Assemblies and methods of use are disclosed for determining a position of a body within a tubing section. A signal generator coupled to the body is operable to generate a pressure wave in response to detecting a detectable portion of the tubing section when the body is moved relative to the tubing section.
Sand Control Assemblies Including Flow Rate Regulators
- Houston TX, US Gregory W. GARRISON - Carrollton TX, US John C. GANO - Carrollton TX, US
International Classification:
E21B 34/12 E21B 41/00 E21B 43/08
Abstract:
A sand control completion system comprises: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand control assembly; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein a reservoir fluid is caused or allowed to simultaneously flow through the first and second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. A method of using the sand control completion system to simultaneously produce a reservoir fluid from more than one zone of a subterranean formation is also provided.