Dr. Dailey graduated from the A.T. Still University of Health Sciences/ Kirksville College of Osteopathic Medicine in 1981. He works in Joplin, MO and 1 other location and specializes in Family Medicine. Dr. Dailey is affiliated with Mercy Hospital Joplin.
Spectrum Medical 800 Memorial Dr STE D, Danville, VA 24541 4347914445 (phone), 4347914244 (fax)
Education:
Medical School East Carolina University Brody School Medicine Graduated: 2010
Languages:
English Spanish
Description:
Dr. Dailey graduated from the East Carolina University Brody School Medicine in 2010. He works in Danville, VA and specializes in Pain Management. Dr. Dailey is affiliated with Danville Regional Medical Center.
James Elvin Dailey - Spring TX, US Metin Karayaka - Houston TX, US
Assignee:
Technip France - Courbevoie
International Classification:
E21B 29/12
US Classification:
166359, 166367, 4052242
Abstract:
A buoyancy can for supporting an offshore oil and gas riser includes an axial bore through which the riser extends coaxially, and a radio-axial slot extending through a side of the can and into the axial bore. A pair of spaced-apart support features are disposed coaxially on the riser, and the can includes a pair of corresponding sockets in the axial bore thereof. The sockets are adapted to receive and vertically support respective ones of the support features in a complementary, axial engagement. The can is placed in the water and moved laterally relative to a fully assembled, vertically supported riser such that the riser passes through the radio-axial slot of the can and into the axial bore thereof without the need for disassembly of the upper portion of the riser. The relative vertical positions of the can and riser are then adjusted such that the support features engage and seat within respective ones of their complementary sockets.
An improved subsea manifold system that is capable of being used in an early production system for producing hydrocarbons from a plurality of wells from a common riser system. The subsea manifold is able to control the fluid from a multiple of subsea wet-tree wells while at the same time giving the operator the option to isolate production from a single subsea well for production evaluation. The subsea manifold also includes a pigging loop which enables efficient pigging of the flowline(s) of the early production system.
Jeremiah Daniel - Houston TX, US James E. Dailey - Spring TX, US Ruxin Song - Katy TX, US
Assignee:
Chevron U.S.A. Inc. - San Ramon CA
International Classification:
E21B 43/01
US Classification:
166367, 166366, 166350, 166352, 4052242, 4052243
Abstract:
A marine riser system for transferring fluid between a well on the seafloor and a vessel floating on the surface of the sea. The riser system has a turret buoy capable of connecting to a floating vessel; two or more hybrid risers, each of the hybrid risers having a vertical riser, a riser buoy attached to the upper portion of the vertical riser and a flexible jumper connecting the riser buoy to the turret buoy, and wherein the hybrid risers are secured to the seafloor. A flowline may connect a lower portion of each of the vertical risers to a subsea manifold, which interconnects the flowline and a subsea well. The subsea manifold is capable of controlling the flow to or from a subsea well. The hybrid risers are positioned about the turret buoy so that the turret buoy is horizontally balanced while disconnected from a vessel. In another embodiment, the marine riser system is capable of directing a fluid from the floating vessel to a subsea export flowline. In another embodiment, the present invention discloses a method of producing hydrocarbons from a subsea well, utilizing the marine riser system.
Walter L. Alexander - Houston TX James E. Dailey - Houston TX John P. Porter - Houston TX
Assignee:
Brown & Root U.S.A., Inc. - Houston TX
International Classification:
B64F 100
US Classification:
244114R
Abstract:
A rocket assembly apparatus is disclosed in which a vertical assembly building houses a multi-stage rocket and provides a clear work area around the entire circumference of the rocket. A mobile rocket service tower is moveable on the floor of the vertical assembly building to any desired circumferential location with respect to the rocket and has a plurality of cantilevered access platforms with curved outer edges for conforming to the shape of the rocket at various vertical and circumferential positions.
Mooring And Supporting Apparatus And Methods For A Guyed Marine Structure
Philip A. Abbott - Houston TX James E. Dailey - Houston TX Demir I. Karsan - Houston TX Andrea Mangiavacchi - Houston TX
Assignee:
Brown & Root, Inc. - Houston TX
International Classification:
E02B 1700
US Classification:
405227
Abstract:
A method and apparatus for supporting a deep water guyed marine structure has a foundation which uses a system of piles connected to the marine structure only at a top portion thereof. The marine structure further has a mooring system which employs pairs of transversely, closely spaced guy lines connected to clump weights and further pairs of transversely, closely spaced guy lines connected from the clump weights to an anchor system. The marine structure mooring system can further provide a vessel mooring system in order to provide adequate control of the vessels during on and off loading of the marine structure and further to prevent fouling of the marine structure mooring system.
John A. Regalbuto - Fort Worth TX James E. Dailey - Houston TX
Assignee:
Jet Research Center Inc. - Arlington TX Brown & Root, Inc. - Houston TX
International Classification:
E02B 1700 B23P 1100
US Classification:
405227
Abstract:
Method and apparatus for the joining of one tubular member to another tubular member through the use of the substantially instantaneous application of high energy to the tubular members, such as by the use of explosives, while placing one tubular member in a state of substantially elastic deformation and the other tubular member in a state of substantially plastic and elastic deformation.
Mooring And Supporting Apparatus And Methods For A Guyed Marine Structure
Philip A. Abbott - Houston TX James E. Dailey - Houston TX Demir I. Karsan - Houston TX Andrea Mangiavacchi - Houston TX
Assignee:
Brown & Root, Inc. - Houston TX
International Classification:
E02B 1700
US Classification:
405227
Abstract:
A method and apparatus for supporting a deep water guyed marine structure has a foundation which uses a system of piles connected to the marine structure only at a top portion thereof. The marine structure further has a mooring system which employs pairs of transversely, closely spaced guy lines connected to clump weights and further pairs of transversely, closely spaced guy lines connected from the clump weights to an anchor system. The marine structure mooring system can further provide a vessel mooring system in order to provide adequate control of the vessels during on and off loading of the marine structure and further to prevent fouling of the marine structure mooring system.
CTO & Director at Micro Energy Credits Corp, Board of Directors at Climate Solutions
Location:
Seattle, Washington
Industry:
Information Technology and Services
Work:
Micro Energy Credits Corp since Jul 2007
CTO & Director
Climate Solutions - Greater Seattle Area since 2001
Board of Directors
VillageReach - Greater Seattle Area Dec 2008 - Jun 2011
CTO
Sevak Solutions Apr 2007 - Mar 2009
Senior Technical Consultant
Grameen Foundation USA Oct 2001 - Jan 2007
Technical Project Manager
Education:
University of Washington 1996 - 1997
University of Notre Dame 1986 - 1990
University of Notre Dame - Mendoza College of Business 1986 - 1990
Social Venture Institute 2011
Skills:
Software Design Business Strategy Entrepreneur Business Development SaaS Climate Change Carbon Markets Program Management International Development Sustainability Social Entrepreneurship Strategic Planning Start-ups Project Management Non-profits Entrepreneurship Nonprofits Corporate Social Responsibility Strategic Partnerships
BRAYS FOREST PATIO HOMES MAINTENANCE FUND, INC Building Maintenance Services · Building Maintenance Services, Nec, Nsk
3000 Wilcrest Dr STE 200, Houston, TX 77042 PO Box 1429, Howellville, TX 77411
James W. Dailey
West Virginia University Educational Services · Benefits · State University · College/University Administrative Educational Programs · Data Processing/Preparation College/University Administrative Social/Manpower Programs · College/University · Telecommunications Department · Motion Pict/Video Prodtn Radio/Television Repair College/University Television Station
Sources said Lyons met with West Virginia officials, including Gee and James Dailey, chairman of WVU's Board of Governors, Saturday in Morgantown, West Virginia, and school officials the week before in Parkersburg, West Virginia.
"Even though the default wasn't terribly unexpected, it creates a concern of systemic risk," said James Dailey, portfolio manager of TEAM Asset Strategy Fund in Harrisburg, Pennsylvania. "On top of that, we havent had any real downside for a while, and anyone who tries to argue that the market isn
Date: Jul 31, 2014
Category: Business
Source: Google
E Gordon Gee Hired As West Virginia's Interim President Five Months After ...
"He is a seasoned and respected higher education leader who has served five major universities over 33 years, and I am confident he will continue the great work going on here and the momentum this University is enjoying," WVU board chairman James Dailey said in a statement.
market. The decline that we have seen in the past four weeks in the bond market would be equivalent to a 30-35 percent decline in the stock market, considering bonds are traditionally not volatile," said James Dailey, senior portfolio manager at Team Asset Strategy Fund in Harrisburg, Pennsylvania.
Date: Jun 24, 2013
Category: Business
Source: Google
Will iPhone maker Apple get crushed in earnings frenzy? - The Star Online
It's not the US$700 stock anymore, but Apple still has huge weighting on indexes, and it's still the window into the state of consumers, a sort of reality check, said James Dailey, portfolio manager of Harrisburg, Pennsylvania-based TEAM Financial Asset Management.
Date: Apr 21, 2013
Category: Business
Source: Google
Gold Heads for Longest Slump Since 2011 Amid Improving Economy
The gold bugs have been obliterated, and the perceptionabout the global economy has changed and people are moving tomore riskier assets, James Dailey, who manages $215 million atTEAM Financial Asset Management LLC in Harrisburg, Pennsylvania,said in a telephone interview. Also, leading up to
James Dailey, portfolio manager at TEAM Asset Strategy Fund in Harrisburg, Pennsylvania, told Reuters: "We seem to be in this manic buying period, and people are reluctant to give up the optimism that the market is going to move higher."
There is an emotional part in buying on the small dips here, said James Dailey, portfolio manager at TEAM Asset Strategy Fund in Harrisburg, Pa. Investors are more worried about missing the rally than losing money as they believe that the fiscal cliff will be solved eventually.
Date: Nov 29, 2012
Source: Google
Googleplus
James Dailey
Work:
Weller Energy Services - Consultant (2004) DuBose National Energy - QA Manager (1984-2004)
Education:
Mt Olive College - Business
James Dailey
Work:
G F S
James Dailey
About:
I am a television reviewer, novelist, and educator.