Southwestern Energy Damascus, AR 2014 to 2014 Completion Services Field InternCalsonic Kansei Lewisburg, TN 2013 to 2013 Forklift Operator/Production TechNational Oilwell Varco Yukon, OK 2012 to 2012 Field TechnicianLockheed Martin Gyrocam Systems
2009 to 2010 Field Service LeadKellogg Brown & Root
2007 to 2008 Service Desk Supervisor/Generator MechanicU.S. Navy Whidbey Island, WA 2001 to 2005 Aviation Electronics Technician
Education:
University of Arkansas Community College at Morrilton Morrilton, AR 2014 Associate of Science in Petroleum TechnologyArkadelphia High School Arkadelphia, AR 2001 Diploma
Apr 2011 to 2000 Vice PresidentCredit Bureau Services Conroe, TX Feb 2010 to Apr 2011 Collections ManagerCredit Bureau Services Conroe, TX May 2009 to Feb 2010 Collections Representative
Education:
SAE Nashville Nashville, TN 2008 to 2009 Associate in Arts in Audio EngineerOdessa College Odessa, TX 1993 to 1995 None in General StudiesConroe H.S. Conroe, TX 1989 to 1993 High School in General Studies
Medical School Northeastern Ohio Universities College of Medicine Graduated: 2001
Languages:
English
Description:
Dr. Bryant graduated from the Northeastern Ohio Universities College of Medicine in 2001. He works in Columbus, OH and specializes in Pediatric Anesthesiology. Dr. Bryant is affiliated with Nationwide Childrens Hospital.
Rajesh K. Saini - Cypress TX, US Narongsak Tonmukayakul - Duncan OK, US Thomas D. Welton - Duncan OK, US Jason E. Bryant - Spring TX, US Sherry G. Gaskins - Lawton OK, US
A subterranean treatment fluid comprising a degradable gemini surfactant composition described by the following formula:A and A′ are spacers that may be a hydrophobic group or a hydrophilic group. B is an ion and may contain a quaternary nitrogen, a sulfonate, or a phosphate. A, A′, B, B′, C, C, E and E′ may be an alkyl, an aryl, a sugar, an ester, an ether, and any combination thereof. D and D′ may be an aryl, a sugar, an ester, an ether, and any combination thereof. In some cases, A′, D′, and E′ may be optional.
Methods including a) volatilizing at least a portion of contaminated water contained in a contaminated water reservoir and thereby generating volatilized water, the contaminated water reservoir being fluidly coupled to a water generator reservoir; b) conveying the volatilized water to the water generator reservoir; c) cooling the volatilized water in the water generator reservoir and thereby generating purified water, substantially dehumidified gas, and heat; and d) conveying at least one of the substantially dehumidified gas and the heat to the contaminated water reservoir.
Supervisory Control System For A Well Construction Rig
- Sugar Land TX, US Shunfeng Zheng - Sugar Land TX, US Anstein Jorud - Kristiansand, NO Jason Bryant - Katy TX, US Loic Hoarau - Houston TX, US
International Classification:
E21B 44/00 E21B 41/00
Abstract:
A supervisory control system for a well construction rig operable to perform well construction operations to construct a planned well at a wellsite. The supervisory control system may be installable in association with the well construction rig. The supervisory control system may comprise a supervisory controller communicatively connectable with a central controller of a rig control system of the well construction rig. The rig control system may be communicatively connected with and operable to control well construction equipment of the well construction rig. The supervisory controller may be operable to control the well construction equipment via the rig control system to cause the well construction equipment to perform the well construction operations. The central controller may be operable as an I/O interface for matching inputs and outputs of the supervisory controller with corresponding inputs and outputs of at least one piece of the well construction equipment.
Supervisory Control System For A Well Construction Rig
- Sugar Land TX, US Shunfeng Zheng - Katy TX, US Anstein Jorud - Kristiansand, NO Jason Bryant - Katy TX, US Loic Hoarau - Katy TX, US
International Classification:
E21B 44/00 H04N 7/18
Abstract:
A supervisory control system for a well construction rig operable to perform well construction operations to construct a planned well at a wellsite. The supervisory control system may be installable in association with the well construction rig. The supervisory control system may comprise a supervisory controller communicatively connectable with a central controller of a rig control system of the well construction rig. The rig control system may be communicatively connected with and operable to control well construction equipment of the well construction rig. The supervisory controller may be operable to control the well construction equipment via the rig control system to cause the well construction equipment to perform the well construction operations. The central controller may be operable as an I/O interface for matching inputs and outputs of the supervisory controller with corresponding inputs and outputs of at least one piece of the well construction equipment.
A reservoir stimulation tool for stimulating a formation surrounding a wellbore having an inner wall includes: a tubular string including an outer wall defining therein an inner bore, the tubular string being configured to be inserted into the wellbore so as to form an annular space between the tubular string and the inner wall of the wellbore, a plurality of ports formed in the outer wall of the tubular string; a plurality of port valves for opening or closing the ports; and a plurality of packers coupled to the tubular string, wherein each packer is configured to be expanded in order to engage the inner wall of the wellbore, thereby isolating two or more longitudinal segments of the annular space from each other.
Wellbore Servicing Materials And Methods Of Making And Using Same
A method of servicing a wellbore in a subterranean formation comprising placing in the wellbore and/or subterranean formation a pad fluid and forming a fracture in the subterranean formation, placing in the fracture a first slurry fluid comprising a reducible material and a first particulate material and in an alternating sequence a second slurry fluid and a spacer fluid, wherein the second slurry fluid comprises a second particulate material, allowing the fracture to close; and allowing the fluids to break and the reducible materials to degrade, wherein a particulate-laden proppant pack (PLPP) is formed.
Methods And Systems For Treatment Of Subterranean Formations
Improved methods and systems for treating subterranean formations using a sub-surface mixing system are disclosed. The disclosed system includes a well head and a first flow line that directs a blender fluid from a blender to the well head. A second flow line directs a Liquefied Petroleum Gas stream to the well head. A static mixer is positioned downhole and is fluidically coupled to the well head. The well head directs the blender fluid to the static mixer through a first flow path and it directs the Liquefied Petroleum Gas stream from the well head to the static mixer through a second flow path. The static mixer then mixes the blender fluid and the Liquefied Petroleum Gas stream.
Methods Of Enhancing Fracture Conductivity Of Subterranean Formations Propped With Cement Packs
- Houston TX, US Jimmie D. Weaver - Duncan OK, US Michael W. Sanders - Houston TX, US Jason E. Bryant - Houston TX, US Loyd E. East - Houston TX, US Guillermo Antonio Izquierdo - Villahermosa CO, US Leopoldo Sierra - Houston TX, US Timothy H. Hunter - Duncan OK, US
Assignee:
Halliburton Energy Services, Inc. - Houston TX
International Classification:
E21B 43/26 C09K 8/80 C09K 8/62
US Classification:
166281, 166283
Abstract:
Methods of treating a subterranean formation including providing a wellbore in a subterranean formation having at least one fracture; providing an expandable cementitious material; introducing the expandable cementitious material into the at least one fracture in the subterranean formation; curing the expandable cementitious material so as to form a cement pack, wherein the curing of the expandable cementitious material expands the expandable cementitious material such that at least one microfracture is created within the at least one fracture in the subterranean formation; and acid-fracturing the at least one fracture in the subterranean formation.
Youtube
HOOKnSHOOT March 2006: Jason Bryant Drama
JOHN TURNER vs JASON BRYANT Sept. 27, 2008 @ The Evansville Coliseum w...
Category:
Sports
Uploaded:
21 Aug, 2008
Duration:
1m 28s
2010-11 Lincoln at the 2010 Holiday Classic p...
San Diego's # 1 ranked team finished 3rd at the Holiday Classic led by...
Category:
Sports
Uploaded:
11 Jan, 2011
Duration:
13m 4s
Tips for Tuning Up Your Popping Cork Rig
Popping corks are a versatile and effective tactic for catching just a...
Category:
Sports
Uploaded:
18 Oct, 2010
Duration:
7m 52s
College Wrestling Highlights: Grand Canyon vs...
Highlights from Grand Canyon University's 24-13 win over Colorado Stat...
Category:
Sports
Uploaded:
27 Jan, 2011
Duration:
4m 5s
James Ross @ Jason Bryant "Hosanna" Written b...
Rousing praise given unto the Lord!!!
Category:
Music
Uploaded:
05 Jan, 2009
Duration:
3m 51s
Texas Tidal Trout
Jason Bryant of Team Texas Tackle Factory using the Killer Shrimp to t...
Laurel Mississippi Parris Island South Carolina Dallas TX Houston TX El Paso TX Havelock NC Gulf Shores AL Houma LA Amelia LA Yuma AZ Lawton OK Jacksonville NC Cherry PT NC San Diego CA
Work:
Your 24/7 Fitness Center and Tanning - Inside sales (7) Targa Resources - Operator (6) United States Army Reserve - 13B (87-88) United States Marine Corps - 7222 (88-93) Quaker Oats Company - Quality Control Lab Technician (93-95) Jason's Paint & Body - Owner (95) Advance Auto Parts - Inventory manager (2000-2003) Falk Alford - Saftey Inspector (2-4) Baker Oil Tools - Tool inspector (4-6)
Education:
Southeastern Baptist Theological Seminary - Christian Education-Counseling, Northeast Jones Highschool - Honors prep classes, Jones County Junior College - Liberal Arts, Northeast jones highschool
About:
I am Believer "in Christ" who is also veteran of the United States Marine Corps and Army, and a full time seminary student, studying to teach and preach. I am already an ordained minister o...
Tagline:
Christian Marine Patriot
Bragging Rights:
I am a Believer in Jesus Christ Son of the MOST HIGH God and A Marine
Jason Bryant
Work:
Self Empoloyed - Photographer
Education:
Indiana University South Bend, Bethany Christian High Schoo - General
Tagline:
Jason Bryant: Photographer.
Jason Bryant
Work:
Great Wolf Lodge, Inc. - Front Desk Agent (7)
Education:
Bayshore Highschool
Tagline:
A little happy, a little fun, a lot of gay.
Jason Bryant
Education:
Arizona State University - English, Midwestern State University - English
Jason Bryant
Work:
Christian Care Nursing Center - CENA
Education:
Orchard View High School
Tagline:
Some kind of happiness that measured out in miles
Jason Bryant
Work:
Liquid Web (2007)
Tagline:
Keep it Classy!
Jason Bryant
Work:
Mortgage Intelligence
Education:
Didn't get one
Tagline:
Comedy genius.
Jason Bryant
Work:
Self Employed - EBay Seller Rockhill Industries - Internet Project Director (Daddy's Son - lol) (1996-1998)