Gaming chairs include a seat sized to receive a user, a frame coupled to the seat, and a tension mechanism. The frame includes at least a foot-actuated-input-device support portion configured to support a foot-actuated input device, such as associated with a video game, in a position to receive inputs from a user's foot when the user is seated on the seat. The tension mechanism is in tension when a user is seated on the seat and applies pressure with a foot against a foot-actuated input device supported by the foot-actuated-input-device support portion and applies pressure against a back portion of the seat with the user's back. In some embodiments, the tension mechanism includes one or more straps and may be described as a strap system. In some embodiments, the gaming chair includes an extended configuration and a collapsed configuration.
Eric Pierce - Portland OR, US Jason Hill - Portland OR, US James Tillett - Portland OR, US Dave Walden - Long Beach CA, US Laura Raymond - Houston TX, US Chris Hickman - Austin TX, US Phong Do - Austin TX, US
Assignee:
INNOVARI, INC. - Austin TX
International Classification:
G05B 13/02
US Classification:
700276, 700296, 700291
Abstract:
Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.
- Hillsboro OR, US David Walden - Austin TX, US Chris Hickman - Lone Tree CO, US Robin Jensen Lunt - Parker CO, US Jason Hill - Portland OR, US Eric Pierce - Portland OR, US Nathan Ronald Ortega - Lake Oswego OR, US Phong Do - Austin TX, US James Tillett - Portland OR, US
International Classification:
G05F 1/66 G05B 15/02
Abstract:
The subject matter described herein relates to the organized measurement, dispatch and/or control of disparate and distributed resources along the length of and at the ends of the electrical grid. Related systems, apparatus, methods, and articles are also described.
- Beaverton OR, US Jason C. Hill - Beaverton OR, US
Assignee:
Tektronix, Inc. - Beaverton OR
International Classification:
H01H 50/00
Abstract:
An electromechanical microswitch, comprising first and second electromagnets mounted in spaced-apart orientation to one another where each electromagnetic has a field center located a first distance above the mounting surface. A permanent magnet is positioned between the electromagnets and includes a magnetic field center that is higher above the mounting surface than that of the electromagnets so that the permanent magnet is magnetically biased toward the mounting surface. A stripline switch element is mountable between the permanent magnet and mounting surface, and biased against circuit structures on the mounting surface, whereby the stripline switch element moves between first and second activated positions under influence of the electromagnets.
- Austin TX, US Eric Pierce - Portland OR, US Jason Hill - Portland OR, US James Tillett - Portland OR, US David Walden - Long Beach CA, US Laura V. Raymond - Houston TX, US Chris Hickman - Austin TX, US Phong Do - Austin TX, US
Assignee:
INNOVARI, INC. - Austin TX
International Classification:
G05B 13/02
US Classification:
700296
Abstract:
Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.
Dr. Hill graduated from the Oklahoma State University Center for Health Sciences College of Osteopathic Medicine in 1999. He works in Talihina, OK and specializes in Family Medicine. Dr. Hill is affiliated with Choctaw Nation Health Sevices Authority.
Dr. Hill works in Slidell, LA and specializes in Internal Medicine. Dr. Hill is affiliated with Ochsner Medical Center Jefferson Highway and Ochsner Medical Center North Shore.
Dr. Hill works in Concord, NC and 1 other location and specializes in Diagnostic Radiology and Neuroradiology. Dr. Hill is affiliated with Carolinas Healthcare System Anson and Carolinas Medical Center.
Wilbur Wright Elementary School New Castle IN 1980-1981, Sylvester Road Elementary School Albany GA 1984-1986, Dougherty Middle School Albany GA 1986-1989
New York, NYManaging Partner at Sound Advice Consulting Servic... Jason M. Hill is the Managing Partner of Sound Advice Consulting. A highly motivated and dedicated individual, Mr. Hill has spent the past decade working... Jason M. Hill is the Managing Partner of Sound Advice Consulting. A highly motivated and dedicated individual, Mr. Hill has spent the past decade working successfully in information technology, staffing and recruitment process outsourcing industries placing professionals in positions ranging from...