Apr 2013 to 2000 Research Assistant, Assistant to the Office of the Dean & Testing Center RepUniversity of South Dakota Yankton, SD May 2013 to Jul 2013 Summer ExternThe Pace Law Firm Washington, UT Jun 2012 to Jul 2012 Summer InternWells Fargo Saint George, UT Apr 2010 to May 2011 Licensed BankerTrivani International Springville, UT May 2009 to Feb 2010 Country Regional ManagerScottrade Salt Lake City, UT Apr 2006 to Aug 2008 StockbrokerFidelity Investments Salt Lake City, UT Dec 2003 to Apr 2006 StockbrokerDeseret First Credit Union Salt Lake City, UT Jul 2001 to Dec 2003 Personal Account Rep/Loan Officer
Education:
William Howard Taft University 2015 Master of Business Administration in BusinessUniversity of South Dakota Vermillion, SD 2011 to 2014 Juris Doctorate in LawUniversity of Utah Salt Lake City, UT 2005 to 2008 Bachelor of Science in GeographyWeber State University Ogden, UT 2000 to 2004 General Studies
A-Krete American Fork, UT 2013 to 2013 Concrete FinisherFJ Burton American Fork, UT 2013 to 2013 Operator/LaborerU of U Hospital Salt Lake City, UT 2011 to 2012 Assistant BuyerCLP Salt Lake City, UT 2010 to 2011 Carpenter/FinisherUnited Structural Concrete Orem, UT 2010 to 2010 FinisherWestern Star Construction Orem, UT 2009 to 2010 FinisherConcrete Solutions and Innovations Cedar Hills, UT 2006 to 2009 Finisher/concrete cutterAnchor Walls Ogden, UT 2005 to 2006 Laborer/OperatorSkip Dunn Orem, UT 2005 to 2005 Pipe LayerSteve Ottosen Fountain Green, UT 2005 to 2005 Laborer/OperatorFocus Lehi, UT 2004 to 2004 Customer Service RepresentativeWalker Electric Springville, UT 2003 to 2004 Apprentice ElectricianPizza Hut American Fork, UT 2000 to 2003 Crew Trainer
Education:
UVSC Orem, UT 2003 to 2004 Electrical ApprenticeshipSnow College Ephraim, UT 2002 to 2003 General ConstructionLehi High School Lehi, UT 2002 High School Diploma
Medicine Doctors
Dr. John C Christiansen, Taylorsville UT - DC (Doctor of Chiropractic)
Weimin Pan - North Layton UT Allen T. Bracken - Layton UT John A. Christiansen - Riverdale UT Kelly D. Wright - Layton UT
Assignee:
Iomega Corporation - Roy UT
International Classification:
G11B 2112
US Classification:
360 75
Abstract:
A head loading apparatus and method for a disk drive device adapts the head load characteristics of a disk drive in order to minimize the velocity of the heads during loading of the heads onto the surface of a data storage medium. The apparatus is characterized by attempting to load the heads onto engagement with a medium, determining whether the heads actually load, measuring the head load velocity, and adjusting the load characteristics of the drive based on the measured head load velocity. Preferably, the pulse width of the loading current applied to the actuator of the drive is adaptive, either increasingly or decreasingly, in response to the measured head load velocity. This adaptive soft head load characteristic of the drive allows the head load velocity to be minimizes to a velocity sufficient to move the read-write heads off of a load ramp and onto the surface of a data storage medium without damaging the head, the medium, or both.
An analytical toilet is disclosed having at least one health and wellness sensor and a base supporting a bowl. A removable access panel is removably attached to the base. A space is provided between the base and the toilet, which is adapted to contain the at least one health and wellness sensor.
Analytical Toilet With A Pressure Sensor Mounting Fixture
- Provo UT, US John W. Christiansen - American Fork UT, US K. Jeffrey Campbell - Spanish Fork UT, US
Assignee:
Medic, Inc. - Provo UT
International Classification:
G01L 19/14 E03D 11/13 G01L 19/00 B81B 7/02
Abstract:
An analytical toilet is disclosed, having a bowl for receiving excreta supported by a base. The toilet also includes a pressure sensor mounting fixture, which has: a chamber with an outlet. The chamber is in fluid communication with the contents of the bowl through the outlet. The pressure sensor mounting fixture also has a pressure sensor cavity above the chamber having an inlet in fluid communication with the chamber such that an air bubble is maintained in the pressure sensor cavity. A pressure sensor is included that is adapted to measure the pressure in the pressure sensor cavity. Also, a system is disclosed for measuring changes in the volume in a toilet bowl. The system includes a pressure sensor mounting fixture, having a chamber with an outlet. The chamber is in fluid communication with the contents of the bowl through the outlet. The pressure sensor mounting fixture also has a pressure sensor cavity above the chamber having an inlet in fluid communication with the chamber such that an air bubble is maintained in the pressure sensor cavity. A pressure sensor is included that is adapted to measure the pressure in the pressure sensor cavity.
Isbn (Books And Publications)
Disaster Preparedness: A Family Protection Handbook
San FranciscoDirector of Sales at Orange Legal Technology Past: Vice President of Sales at Zapproved, Vice President of Business Development at JD Supra... John has a long history of growing small businesses and startups into successful enterprises. In addition to having ownership in several small businesses... John has a long history of growing small businesses and startups into successful enterprises. In addition to having ownership in several small businesses himself, John has over 20 years experience in sales, sales management and general management roles. Always a top performer in sales, John is...
New Wave Capital Limited t/a Capital on Tap www.capitalontap.com - Head of Risk and Credit (2012)
About:
Statistician, financial services and banking quant with particular focus on SME and consumer / quasi-consumer credit portfolios. Model designer and implementer of PD and LGD for residential, commercia...
Tagline:
Head of Risk and Credit, Capital on Tap
Bragging Rights:
Many, but one tries to be modest.
John Christiansen
Education:
University of Colorado at Colorado Springs - Counseling and Human Services MA, University of Colorado at Boulder - Psychology BS, German Studies BS
The well was drilled in 1993. State records show it was shut down all of last year and resumed production in January, although the records do not show the reasons. Anadarko spokesman John Christiansen declined to comment, citing the ongoing investigation.
Date: Apr 29, 2017
Category: Business
Source: Google
Anadarko Cuts 1000 Jobs as It Idles Drilling Rigs, Sells Assets
The third-largest U.S. natural gas producer is laying off about 1,000 workers, roughly a 17 percent reduction, said company spokesman John Christiansen. The move will affect departments throughout the organization, he said.
Date: Mar 10, 2016
Category: Business
Source: Google
Riverbed to Be Acquired by Thoma Bravo for $21.00 Per Share in Cash
There is a need for factual science-based information tobe in the communities, said John Christiansen, a spokesman forthe company based in The Woodlands, Texas. There also needs tobe an understanding of the regulations that are already inplace.
We continue to cooperate with the government of Guyana and other relevant authorities to resolve this situation in a safe and expedient manner, Anadarko spokesman John Christiansen said in an emailed statement.
Date: Oct 12, 2013
Category: Business
Source: Google
Venezuela Detains Anadarko Oil Vessel in Disputed Waters
The MV Teknik Perdana was under contract to our companyand conducting a seafloor survey on behalf the government ofGuyana, John Christiansen, a spokesman for the Woodlands,Texas-based company, said in an e-mail today.
Date: Oct 11, 2013
Category: Business
Source: Google
More oil, gas damage reported throughout Weld County
Company spokesman John Christiansen added: Weve been very active in not only assessing our facilities and operations but in reporting any issues. Something that we want to make clear, is were out there very much in front of this.
Date: Sep 20, 2013
Category: U.S.
Source: Google
New Colo. Oil Spills Found as Flood Delays Cleanup
With many roads in the area washed out, the spill sites remained largely inaccessible, preventing cleanup work from getting underway until water levels drop, said Anadarko spokesman John Christiansen.