Intermountain Sleep Disorder Center LDS Hospital 3723 W 12600 S STE 480, Riverton, UT 84065 8012854870 (phone), 8012854871 (fax)
Education:
Medical School Ohio State University College of Medicine Graduated: 2006
Procedures:
Sleep and EEG Testing
Conditions:
Restless Leg Syndrome Dementia Epilepsy Hemorrhagic stroke Insomnia
Languages:
English
Description:
Dr. Walker graduated from the Ohio State University College of Medicine in 2006. He works in Riverton, UT and specializes in Neurology and Sleep Medicine. Dr. Walker is affiliated with Alta View Hospital, LDS Hospital and Riverton Hospital.
The Ogden Clinic 4700 Harrison Blvd, Ogden, UT 84403 8014753225 (phone), 8014753227 (fax)
Procedures:
Hallux Valgus Repair Arthrocentesis
Conditions:
Plantar Fascitis Hallux Valgus Tinea Pedis
Languages:
English Spanish
Description:
Dr. Walker works in Ogden, UT and specializes in Podiatric Medicine. Dr. Walker is affiliated with Intermountain McKay-Dee Hospital Center and Ogden Regional Medical Center.
Medical School University of Minnesota Medical School at Minneapolis Graduated: 1991
Conditions:
Fractures, Dislocations, Derangement, and Sprains Scoliosis or Kyphoscoliosis
Languages:
English Spanish
Description:
Dr. Walker graduated from the University of Minnesota Medical School at Minneapolis in 1991. He works in Hopkins, MN and specializes in Orthopedic Pediatric Surgery and Orthopaedic Surgery Of Spine. Dr. Walker is affiliated with Gillette Childrens Specialty Healthcare.
Medical School Medical University of South Carolina College of Medicine Graduated: 2004
Languages:
English
Description:
Dr. Walker graduated from the Medical University of South Carolina College of Medicine in 2004. He works in Greer, SC and 1 other location and specializes in Anesthesiology.
Kevin R. Walker - Los Gatos CA, US John H. Mylius - Framingham MA, US
Assignee:
Apple Inc. - Cupertino CA
International Classification:
G06F 11/00
US Classification:
714 30, 712227
Abstract:
In one embodiment, an integrated circuit comprises a first processor configured to output program counter (PC) trace records, wherein PC trace records provide data indicating the PCs of instructions retired by the first processor. The integrated circuit further comprises a second source of trace records, and a trace unit coupled to receive the PC trace records from the first processor and the trace records from the second source. The trace unit comprises a trace memory into which the trace unit is configured to store the PC trace records and trace records from the second source. The trace unit is configured to interleave the PC trace records and the trace records from the second source in the trace memory according to the order of receipt of the records.
Kevin R. Walker - Los Gatos CA, US John H. Mylius - Framingham MA, US
Assignee:
Apple Inc. - Cupertino CA
International Classification:
G06F 11/00
US Classification:
714 45
Abstract:
In one embodiment, an integrated circuit comprises a first processor configured to output program counter (PC) trace records, wherein PC trace records provide data indicating the PCs of instructions retired by the first processor. The integrated circuit further comprises a second source of trace records, and a trace unit coupled to receive the PC trace records from the first processor and the trace records from the second source. The trace unit comprises a trace memory into which the trace unit is configured to store the PC trace records and trace records from the second source. The trace unit is configured to interleave the PC trace records and the trace records from the second source in the trace memory according to the order of receipt of the records.
Clayton Alexander - Westlake CA, US Todd Metlen - Ojai CA, US Doug Botos - San Diego CA, US Jesse Melrose - San Diego CA, US Kevin Walker - Raleigh NC, US
A light module is removably coupleable to a light fixture and includes an LED lighting element mounted on a mounting base that is operatively coupled to a housing. The light module also includes one or more resilient members that operatively couple the mounting base to the housing and allow the mounting base and housing to resiliently move relative to each other. The resilient members compress when the light module is removably coupled to the light fixture to exert a generally axial force on the mounting base to drive the mounting base into resilient contact with a surface of the light fixture to provide a thermal coupling between the light module and the light fixture.
Kevin R. Walker - Los Gatos CA, US John H. Mylius - Framingham MA, US
Assignee:
Apple Inc. - Cupertino CA
International Classification:
G06F 11/00
US Classification:
714 45
Abstract:
In one embodiment, an integrated circuit comprises a first processor configured to output program counter (PC) trace records, wherein PC trace records provide data indicating the PCs of instructions retired by the first processor. The integrated circuit further comprises a second source of trace records, and a trace unit coupled to receive the PC trace records from the first processor and the trace records from the second source. The trace unit comprises a trace memory into which the trace unit is configured to store the PC trace records and trace records from the second source. The trace unit is configured to interleave the PC trace records and the trace records from the second source in the trace memory according to the order of receipt of the records.
Debug Registers For Halting Processor Cores After Reset Or Power Off
Deniz Balkan - Santa Clara CA, US Kevin R. Walker - Los Gatos CA, US
Assignee:
Apple Inc. - Cupertino CA
International Classification:
G06F 11/00
US Classification:
714 31, 714 27
Abstract:
A method and apparatus of stopping a functional block of an integrated circuit (IC) for debugging purposes is disclosed. In one embodiment, an IC includes a number of functional units accessible by an external debugger via a debug port (DP). During a debug operation, a power controller in the IC may power down a functional unit. When the functional unit is powered off, a first register may be programmed. Responsive to the programming of the first register, a first signal may be asserted and provided to the functional unit. When power is restored to the functional unit, operation of the functional unit may be halted prior to execution of instructions or other operations, responsive to the signal.
Brad Medford - Austin TX, US Kevin B. Walker - Oswego IL, US Robert B. Hill - Spring Branch TX, US Thomas Scott Webster - San Antonio TX, US
Assignee:
AT&T Intellectual Property I, L.P. - Atlanta GA
International Classification:
H04M 11/04 H04N 7/167 H04N 7/173
US Classification:
4554041, 725 33, 725108
Abstract:
A system and method for providing Emergency Alert System (EAS) notifications over Internet Protocol (IP) delivery platforms, including a proxy server coupled to an emergency alert system receiver, a subscriber management database coupled to the proxy server, and an instant messaging server coupled to the proxy server and to the subscriber management server.
Deniz Balkan - Santa Clara CA, US Kevin R. Walker - Los Gatos CA, US
International Classification:
G06F 19/00
US Classification:
702125
Abstract:
A debug port configured to generate and provide a return clock is disclosed. In one embodiment, an integrated circuit (IC) includes one or more functional units and a debug port (DP). The DP is configured to enable access by an external debugger to the functional unit(s) of the IC for debugging purposes. The DP includes circuitry that may generate a first clock signal that is provided to the functional unit(s) during debug operations. Receiving test result data at the DP may require a return clock signal that is not provided by the functional unit(s). Accordingly, the IC may include a clock modifier coupled to receive the first clock signal. The clock modifier may generate a second clock signal based on the first, the second clock signal being provided to the DP as a return clock signal.
Debug Registers For Halting Processor Cores After Reset Or Power Off
Apple Inc. - Cupertino CA, US Kevin R. Walker - Los Gatos CA, US Mitchell P. Lichtenberg - Sunnyvale CA, US
Assignee:
APPLE INC. - Cupertino CA
International Classification:
G06F 11/26
US Classification:
714 34
Abstract:
A method and apparatus of stopping a functional block of an integrated circuit (IC) for debugging purposes is disclosed. In one embodiment, an IC includes a number of functional units accessible by an external debugger via a debug port (DP). During a debug operation, a power controller in the IC may power down a functional unit. When the functional unit is powered off, a first register may be programmed. Responsive to the programming of the first register, a first signal may be asserted and provided to the functional unit. When power is restored to the functional unit, operation of the functional unit may be halted prior to execution of instructions or other operations, responsive to the signal.
Director of Employer InsightsDell, Inc. Austin, TX Apr 2007 to Feb 2014 Director of MarketingKanan Cruises Chicago, IL Nov 2005 to Jul 2006 Director of Sales and MarketingShoreline Sightseeing Chicago, IL May 2002 to Nov 2005 Marketing ManagerSpirit Cruises Seattle, WA Sep 1998 to Nov 2001 Sales Associate
Education:
University of Chicago Booth School of Business Chicago, IL 2005 to 2007 MBA in Marketing & StrategyUniversity of Washington Seattle, WA 1998 to 2000 BA in Political Science
Jun 2006 to 2000 Merchandiser/SalesColumbia Everett, WA Jun 2005 to Jun 2006 MerchandiserAlbertson's Lake Stevens, WA Jun 1998 to Feb 2005 Grocery Clerk/Stocker
KKP Financial and Insurance Services Walnut Creek, CA Feb 2011 to Dec 2014 Director of Operations/Life InsuranceSitzmann, Morris & Lavis (a Brown & Brown Company) Oakland, CA Aug 2008 to Aug 2011 Account Manager, Life DepartmentPEN CAL Adimistrators Pleasanton, CA Mar 2003 to Aug 2008 Financial AnalystNorthwesten Mutual Menlo Park, CA Feb 2001 to Mar 2003 Financial Planner - Life AgentGMNameplate, Inc San Jose, CA Jun 1998 to Feb 2001 Process Engineer and Account ManagerTiffany & Company Beverly Hills, CA Oct 1996 to Jun 1998 Corporate Sales Representative
Education:
Golden Gate University San Francisco, CA 2001 Master of Science in Financial PlanningUniversity of California Los Angeles, CA 1996 Bachelor of Arts in History
Kevin Herbert Walker is the name of a fictional character on ABC's family drama Brothers & Sisters. He is portrayed by actor Matthew Rhys. In a two-part 2010 ...
License Records
Kevin Walker
License #:
1202212012 - Expired
Category:
Cosmetology Salon License
Issued Date:
Jan 7, 2010
Expiration Date:
Jan 31, 2012
Type:
Cosmetology Salon
Kevin Allen Walker
License #:
TCP157408 - Expired
Category:
EMS Licensing
Issued Date:
Sep 3, 2015
Expiration Date:
Dec 14, 2015
Type:
None
Kevin J Walker
License #:
RS170974L - Expired
Category:
Real Estate Commission
Type:
Real Estate Salesperson-Standard
Googleplus
Kevin Walker
Lived:
Springfield, Mo Grove, Ok Houston, Tx Austin, Tx Miami, Ok Branson, Mo Lake Jackson, Tx Springfield, Tx
Work:
LemonDrop - Booking Vans Shoes Embodiment Records
Education:
Grove High School, N.E.O. A&M
About:
I live by the P.M.A. I make music.I book shows. I love LemonDrop
Kevin Walker
Lived:
Renton, WA Richland, WA San Diego, CA Boise ID Seattle, WA Spokane WA Kennewick WA Boston, MA
Work:
Microsoft - Software Development Engineer (2012) Amazon.com - Software Development Engineer (2011-2012)
Relationship:
Married
Kevin Walker
Lived:
Dallas Dallas, TX Georgetown, TX
Work:
Walker & Deopnfer PC - Intern Canyon Creek Country Club - Lifeguard
Education:
Trinity Christian Academy, Homeschooled, Grace Academy, Forbes MIddle School, Parkhill Junior High, Pearce High School
About:
Live in dallas. go to tca. like to play football, fish, hunt, and go to the lake
Tagline:
Gone fishin
Kevin Walker
Work:
SimpleTuition - CEO (2005) Cole Management - Vice President (2004-2005) First Marblehead - SVP Marketing (2001-2004) The Parthenon Group - Principal (2000-2001) First Marblehead - Vice President (1992-1998) School of Russian Studies - Founder (1991-1994)
Education:
Amherst College - Russian, Harvard Business School
Hi,What's up World?!! Glad you could join me, on this odyssey together. Let's make it a better place, by, living better with one another, and, being respectful of, one another's difference...
Bragging Rights:
I am the greatest Boston sports fan, EVER!!!
Kevin Walker
Work:
Gap Inc. - Sales Associate (2012)
Education:
ECTC - Radiology
Kevin Walker
Work:
Northland Process Piping INC - Welder/ fabricator (2009)
Education:
Marine corps Diesel Mechanics - Veh mechanic
Bragging Rights:
Survived High School. Somalia. The united Arab emirates Thai Land The Philippines Malaysia :/ you know I'm just glad to be here:)
Munich, Germany-Current : Allianz SE Group Planning and Controlling—Munich where his team focuses on life and pc business in several regions including US, Great Britain... -Current : Allianz SE Group Planning and Controlling—Munich where his team focuses on life and pc business in several regions including US, Great Britain, Eastern Europe and Asia Pacific.
-Between 2000 and 2006: Allianz Life SVP, Treasurer and Investment Officer--Minneapolis. The Treasury...