William L. Matheson - Palm Bay FL, US Paul M. Julich - Indialantic FL, US Michael S. Crone - W. Melbourne FL, US Douglas A. Thomae - Melbourne FL, US Thu V. Vu - W. Melbourne FL, US M. Scott Wills - Melbourne FL, US
Assignee:
Harris Corporation - Melbourne FL
International Classification:
G06Q 10/00
US Classification:
705 8, 706 45, 705 7
Abstract:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
William L. Matheson - Palm Bay FL, US Paul M. Julich - Indialantic FL, US Michael S. Crone - W. Melbourne FL, US Douglas A. Thomae - Melbourne FL, US Thu V. Vu - W. Melbourne FL, US M. Scott Wills - Melbourne FL, US
Assignee:
Harris Corporation - Melbourne FL
International Classification:
G06Q 99/00
US Classification:
701 19, 705 1, 705 8, 706 16, 706 23, 706 41
Abstract:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
System And Method For Scheduling And Train Control
William L. Matheson - Palm Bay FL, US Paul M. Julich - Indialantic FL, US Michael S. Crone - W. Melbourne FL, US Douglas A. Thomae - Melbourne FL, US Thu V. Vu - W. Melbourne FL, US M. Scott Wills - Melbourne FL, US
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
System And Method For Computer Aided Dispatching Using A Coordinating Agent
Paul M. Julich - Indialantic FL, US Mitchell Scott Wills - Melbourne FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
G06F 19/00 G01C 21/00 G06G 7/76 G05D 3/00
US Classification:
701117, 701 19, 701202, 701301
Abstract:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into a plurality of planning areas with a boundary element of common track between adjacent planning areas, using a local coordinating agent for controlling the movement of the trains through the boundary elements.
William L. Matheson - Palm Bay FL, US Paul M. Julich - Indialantic FL, US Michael S. Crone - W. Melbourne FL, US Douglas A. Thomae - Melbourne FL, US Thu V. Vu - W. Melbourne FL, US M. Scott Wills - Melbourne FL, US
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
System And Method For Scheduling And Train Control
William L. Matheson - Palm Bay FL, US Paul M. Julich - Indialantic FL, US Michael S. Crone - W. Melbourne FL, US Douglas A. Thomae - Melbourne FL, US Thu V. Vu - W. Melbourne FL, US M. Scott Wills - Melbourne FL, US
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
Method Of Planning Train Movement Using A Three Step Optimization Engine
Wolfgang Daum - Erie PA, US John Hershey - Ballston Lake NY, US Randall Markley - Melbourne FL, US Paul Julich - Indialantic FL, US Mitchell Scott Wills - Melbourne FL, US David Davenport - Niskayuna NY, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
G06N 5/00
US Classification:
706 19, 706 45
Abstract:
A method of scheduling network resources in a first domain by transforming the problem to a second domain, solving the problem and transforming back to the first domain.
System And Method For Computer Aided Dispatching Using A Coordinating Agent
Paul M. Julich - Indialantic FL, US Mitchell Scott Wills - Melbourne FL, US
Assignee:
General Electric Company - Schenectady NY
International Classification:
G06G 7/76 B61B 12/00 G08G 1/00
US Classification:
701117, 701118, 701 19, 340905, 104307
Abstract:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into a plurality of planning areas with a boundary element of common track between adjacent planning areas, using a local coordinating agent for controlling the movement of the trains through the boundary elements.