Teacher at Teacher at Barron Collier High School, Football and Lacrosse Coach at Barron Collier High School
Location:
Naples, Florida
Industry:
Primary/Secondary Education
Work:
Teacher at Barron Collier High School since Aug 2011
Teacher
Barron Collier High School since Aug 2011
Football and Lacrosse Coach
Coeur d'Alene High School Aug 2003 - Jun 2011
Teacher
IDLA - Idaho Digital Learning Academy Jun 2008 - Jan 2010
Teacher
Coeur d'Alene High School Jun 2004 - Oct 2007
Head Lacrosse Coach
Education:
Colorado State University 1994 - 1996
Teaching Certification, English
Penn State University 1987 - 1991
B.A. English - Writing Concentration, History Minor
Medical School University of South Florida College of Medicine at Tampa Graduated: 2002
Procedures:
Lumbar Puncture
Conditions:
Diabetes Mellitus (DM) Disorders of Lipoid Metabolism Hypertension (HTN)
Languages:
English
Description:
Dr. Swartz graduated from the University of South Florida College of Medicine at Tampa in 2002. He works in Tampa, FL and 5 other locations and specializes in Diagnostic Radiology. Dr. Swartz is affiliated with Bayfront Health Spring Hill, St Josephs Hospital, St Josephs Hospital - North and St Josephs Hospital South.
Us Patents
Determining Edge Relationship Between Clock Signals
Himanshu J. Verma - Mountain View CA, US Ajay Dalvi - San Francisco CA, US Paul A. Swartz - Hillsborough CA, US
Assignee:
Xilinx, Inc. - San Jose CA
International Classification:
G01R 31/28
US Classification:
714744
Abstract:
First and second clock signals are provided to first and second sequential circuits, where the first and second clock signals are inversely coupled to logic high and low levels for clocking of the first and second sequential circuits. A third sequential circuit is clocked responsive to a first output from the first sequential circuit and receives first signature data. A fourth sequential circuit is clocked responsive to a second output from the second sequential circuit and receives second signature data. A third output from the third sequential circuit is monitored responsive to the first signature data and the first output. A fourth output from the fourth sequential circuit is monitored responsive to the second signature data and the second output. Whether the first clock signal and the second clock signal are phase aligned may be determined responsive to the third output and the fourth output.
Method And Apparatus For Measuring Duty Cycle Distortion On An Integrated Circuit
Himanshu J. Verma - Mountain View CA, US Paul T. Nguyen - Fremont CA, US Paul A. Swartz - Hillsborough CA, US
Assignee:
Xilinx, Inc. - San Jose CA
International Classification:
G01R 31/28 H03K 3/017 H03K 7/08 H03H 11/26
US Classification:
714731, 327175, 327265
Abstract:
A method and apparatus for the utilization of on-chip, programmable resources to implement a signal distortion characterization circuit. Programmable logic resources, such as programmable delay lines and phase shifting circuits, are utilized to sample the logic value of a test signal after the test signal has traversed a path under test (PUT). A counter is used to determine the number of logic high valued samples and the number of logic low valued samples during a test period. A ratio is then taken to determine the resulting duty cycle for the test period.
Himanshu J. Verma - Mountain View CA, US Ajay Dalvi - San Francisco CA, US Paul A. Swartz - Hillsborough CA, US
Assignee:
XILINX, Inc. - San Jose CA
International Classification:
G06K 5/04
US Classification:
714700
Abstract:
Cross-correlation of delay line characteristics is described. An integrated circuit for cross-correlation testing includes: a first ring oscillator and a second ring oscillator. The first ring oscillator includes a first test circuit, and the second ring oscillator includes a second test circuit. The first test circuit is coupled via first programmable interconnects to first ring oscillator circuitry, and the second test circuit is coupled via second programmable interconnects to second ring oscillator circuitry. The first test circuit includes a first programmable delay line, and the second test circuit includes a second programmable delay line. The first test circuit and the second test circuit are configured to provide separately controllable outputs for cross-correlation as between the first programmable delay line and the second programmable delay line.
Circuit For Measuring Signal Delays Of Asynchronous Inputs Of Synchronous Elements
Christopher H. Kingsley - San Jose CA, US Kusuma Bathala - San Jose CA, US Richard D. J. Duce - San Jose CA, US Paul A. Swartz - Hillsborough CA, US
Assignee:
Xilinx, Inc. - San Jose CA
International Classification:
G11B 5/00
US Classification:
714700, 714707
Abstract:
A system measures propagation delays in any number of test circuits, each having two asynchronous inputs and an output, without using their clock inputs to re-initialize the test circuits during measurement operations. The delay between one of the test circuit's asynchronous inputs and its output is measured by propagating a test signal from the one asynchronous input to the output, and the test circuit is re-initialized using the test circuit's other asynchronous input.
Paul Swartz (1969-1973), Robert Young (1965-1969), Andrew Heuer (1965-1969), Thomas Groat (1956-1959), Gerald Costanzo (1959-1963), David Bonnevie (1968-1972)
paul carmichael (1974-1978), Tina Campbell (1978-1982), Paul Piorkowski (1976-1980), Paul Swartz (1979-1983)
Googleplus
Paul Swartz
Work:
Sutton Group Old Mill Realty - Real Estate Broker, M.V.A (1990) My first job out of College was an Insurance Adjuster at Commerical Union Insurance in - Insurance Adjuster (1972-1978) A.E. Lepage Realty - Sales representative (1978-1990)
Education:
Humber College - Journalism/General Arts, Humber College - Business
Relationship:
Single
About:
Born in Toronto I went to York Memorial Collegiate and studied Business and General Arts at Humber College.We were the first group of students to go there in 1969. My career took me to the Real Estate...
Bragging Rights:
My second passion is guitar and I have played in the Markland Woods Big Band for over 20 years.
Paul Swartz
Work:
Matchbox, Inc - Lead Software Developer (2012) Participatory Culture Foundation - Software Developer (2007-2012)
Education:
Hampshire College - Computer Science & Literature
About:
Software developer, Ultimate player, Crossfitter, renaissance man
The moratorium call drew a sharp response from Paul Swartz, the SRBC's executive director. He said the decision on a moratorium lies outside the commission's jurisdiction and belongs to the three states (New York, Pennsylvania and Maryland) that are in the Susquehanna watershed and make up the comm
Date: May 17, 2011
Category: Sci/Tech
Source: Google
Gas drilling lands Susquehanna River on top of list
Paul Swartz, executive director of the Susquehanna River Basin Commission, said the group is well aware of public concern regarding the gas industry and subsequent effects on the Susquehanna and all Pennsylvania drinking water supplies.