Product Safety and Risk Leader at GE Energy Management
Location:
Schenectady, New York
Industry:
Oil & Energy
Work:
GE Energy Management - Schenectady, NY since Oct 2012
Product Safety and Risk Leader
GE Energy - Global Jun 2007 - Oct 2012
Technical Enterprise Risk Manager
GE Energy Jun 2007 - Dec 2010
Manager, Systems Reliability Engineering
GE Energy Jun 2005 - Jun 2007
Six Sigma Lean Black Belt
GE Energy 2000 - Jun 2005
Senior Engineer
Education:
Clarkson University 1994 - 1996
BS, Aeronautical Engineering
Alfred State College - SUNY College of Technology 1991 - 1994
Associates, Engineering Science
John F. Welch Center - Crotonville, New York 2002
Skills:
GE Black Belt Certified Six Sigma Project Management Cross-functional Team Leadership Process Improvement Strategic Planning Continuous Improvement Business Process Design Enterprise Risk Management Operational Risk Management Reliability Engineering Quality Management Supplier Quality
Interests:
Downhill Skiing
Mountain Biking
Clarkson Hockey
Travel
Us Patents
Systems And Methods For Analyzing Failure Modes According To Cost
John Anthony Conchieri - Greenfield NY, US Michael J. Dell'Anno - Clifton Park NY, US Ronald P. Wiederhold - Schenectady NY, US Edward Hardwicke - Greenville SC, US
Assignee:
GENERAL ELECTRIC COMPANY - Schenectady NY
International Classification:
G06Q 10/00
US Classification:
705 7
Abstract:
Disclosed are systems, methods, and computer readable media for analyzing failure modes derived from a failure modes and effects analysis. One or more failure modes for a product are identified. A respective cost exposure for each of the identified one or more failure modes is determined in order to provide the criticality and risk of a product's failure modes in financial terms. The one or more failure modes can then be prioritized in accordance with the determined cost exposure.
Systems And Methods For Providing Risk Methodologies For Performing Supplier Design For Reliability
Michael J. Dell'Anno - Clifton Park NY, US Ronald Paul Wiederhold - Waterford NY, US
Assignee:
GENERAL ELECTRIC COMPANY - Schenectady NY
International Classification:
G06Q 99/00
US Classification:
705 1
Abstract:
Embodiments of the invention can provide systems and methods for providing risk methodologies for performing supplier design for reliability. According to one embodiment of the invention, a method for analyzing reliability associated with a product provided by a supplier can be provided. The method can include providing a supplier a specification for a product, wherein the specification is based at least in part on an amount of risk to be associated with the product. In addition, the method can include requesting the supplier to perform at least one task to analyze reliability associated with the product in accordance with the specification. Furthermore, the method can include obtaining an output associated with the reliability from the supplier. Furthermore, the method can include comparing the output to the specification for the product. In addition, the method can include based at least in part on the comparison, approving or disapproving of the product.
Youtube
Stanford 125: Gio Wiederhold
Stanford 125 Stories.
Duration:
5m
Nerve Surgery Helps Ronald Overcome 11 Years ...
Ronald is a deputy sheriff injured on the job. He shattered his whole ...
Duration:
3m 4s
Manure Utilization
Welcome to another version of the NDSU extension nutrient management o...
Duration:
10m 59s
Cristiano Ronaldo In Tears After 0-1 Loss Aga...
Cristiano Ronaldo In Tears After 0-1 Loss Against Morocco In The Quart...
Duration:
1m 45s
Twig and Lace: Handstamped keychains and gift...
FOX 10's Ty Brennan checks out Twig and Lace, a business in Phoenix ow...
Duration:
8m 13s
Playing God? Monsters, Miracles, and the Poli...
Ronald Herring is a professor of government and the director of the Pr...